My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2555
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2555
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2016 1:31:49 PM
Creation date
5/31/2016 4:55:53 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2555
Date (mm/dd/yyyy)
05/19/2016
Description
Awd Bid 16-04-01 & Manager Authorization to Negotiate & Enter into Agmt w/Southern Underground for 172 St Drainage
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 16. SITE INVESTIGATION AND REPRESENTATION <br /> 16.1 The Contractor acknowledges that it has satisfied itself as to the nature and location of <br /> the Work, the general and local conditions, particularly those bearing upon availability of <br /> transportation, disposal, handling and storage of materials, availability of labor, water, electric <br /> power, and roads, the conformation and conditions at the ground and all other matters which can <br /> in any way affect the Work or the Contract Amount. <br /> 16.2 The Contractor further acknowledges that it has satisfied itself as to the character, <br /> quality, and quantity of surface and subsurface materials to be encountered from evaluating <br /> information included in the Contract Documents. Any failure by the Contractor to acquaint itself <br /> with all the provided information will not relieve Contractor from responsibility for properly <br /> estimating the difficulty or cost thereof under the Contract Documents. <br /> ARTICLE 17. OWNERSHIP AND USE OF DOCUMENTS <br /> The Drawings, Specifications and other documents prepared by the City and copies thereof <br /> furnished to the Contractor, are for use solely with respect to this Agreement. They are not to be <br /> used by the Contractor, Sub-Contractors, and/or material suppliers on other projects, without <br /> the specific express written consent of the City. The Contractor, Sub-Contractors, and/or material <br /> suppliers are granted only a limited license to use and reproduce applicable portions of the Drawings, <br /> Specifications, and other documents prepared by the City or its designee, appropriate to and for use <br /> in the execution of their Work under this Agreement. <br /> ARTICLE 18. PLANS, SPECIFICATIONS AND WORKING DRAWINGS <br /> 18.1 The City shall have the right to modify the details of the Plans, Specifications, and Working <br /> Drawings with additional plans, drawings or additional information as the Work proceeds, all of <br /> which shall be considered as part of the Contract Documents. <br /> 18.2 Where the Contractor believes that the modification or supplement is outside the Scope <br /> of the Work, the Contractor shall, within 72 hours, notify the City that the modification or <br /> supplement is outside the scope of the Work. At that time the modification or supplement may be <br /> rescinded or the Contractor may be required to submit a request for a Change Order proposal. <br /> Where the Contractor is notified of the City's position that the modification or supplement is <br /> within the scope and the Contractor disagrees, the Contractor shall notify the City that the <br /> Contractor reserves the right to make a claim for the time and monies based on the modification <br /> or supplement. At no time shall the Contractor refuse to comply with the modification or <br /> supplement. <br /> 18.3 When, in the opinion of the City, it becomes necessary to explain the Work to be done more <br /> fully, or to illustrate the Work further, or to show any changes which may be required, <br /> supplementary drawings, with specifications pertaining thereto, will be prepared by the City or its <br /> Designee. The supplementary drawings shall be binding upon Contractor with the same force as the <br /> Contract Documents. Where such supplementary drawings require either less or more than the <br /> original quantities of work, appropriate adjustments shall be made by Change Order. <br /> C5966-1516-082 SOUTHERN UNDERGROUND INDUSTRIES,INC. 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.