My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2555
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2555
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2016 1:31:49 PM
Creation date
5/31/2016 4:55:53 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2555
Date (mm/dd/yyyy)
05/19/2016
Description
Awd Bid 16-04-01 & Manager Authorization to Negotiate & Enter into Agmt w/Southern Underground for 172 St Drainage
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Project Manager means an employee or representative of the City assigned to manage and monitor <br /> the Work to be performed under this Agreement and the construction of the Project. <br /> Project means the construction and incidentals thereto, of the project entitled ITB No. 16-04- <br /> 01 "172nd Drainage Repairs", as described in the Contract Documents. <br /> Project Site means the area for the proposed Project for the installation of drainage repairs within <br /> the 172nd street corridor. <br /> Punch List means a compilation of items of Construction Work required to be performed by, or <br /> through the Contractor after the Substantial Completion inspection and prior to Final Completion <br /> and payment. <br /> Request For Information (RFI) means a request from the Contractor seeking an interpretation <br /> or clarification by the City relative to the Agreement and/or the Contract Documents. The RFI, <br /> which shall be clearly marked RFI, shall clearly and concisely set forth the issue(s) or item(s) <br /> requiring clarification or interpretation and why the response is needed. The RFI must set forth the <br /> Contractor's interpretation or understanding of the document(s) in question, along with the <br /> reason for such understanding. <br /> Schedule of Values means a written schedule setting forth the detailed and itemized cost breakdown, <br /> inclusive of labor, material, and taxes of all elements comprising the Work. <br /> Specifications and Plans as used herein means that portion of the Contract Documents which <br /> are the written requirements for the materials, equipment, systems, standards and workmanship for <br /> completion of the Work and performance of related services for this Project. <br /> Sub-Contractor(s) means a person or entity other than a materialman or laborer that has a <br /> direct contract with the Contractor to perform or supply any portion of the Work in connection <br /> with this Project. <br /> Substantial Completion means that point at which the Work is at a level of completion in <br /> substantial compliance with the Agreement such that the City can use, occupy and/or operate the <br /> Project in all respects to its intended purpose. Substantial Completion shall be evidenced by the <br /> City's execution of a Certificate of Substantial Completion. <br /> Time for Completion means the date of Substantial Completion as specified in the Contract <br /> Documents. <br /> Final Completion means the date certified by the City that all documents required by the <br /> Contract Documents have been received by the City; any other documents required to be <br /> provided by Contractor have been received by City; and to the best of City Manager his or <br /> designee's knowledge, information and belief the Work defined herein has been fully <br /> completed in accordance with the terms and conditions of the Contract Documents. <br /> C5966-1516-082 SOUTHERN UNDERGROUND INDUSTRIES,INC. 3 S 1 B <br />
The URL can be used to link to this page
Your browser does not support the video tag.