My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2554
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2554
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2016 3:58:12 PM
Creation date
5/31/2016 5:00:43 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2554
Date (mm/dd/yyyy)
05/19/2016
Description
Agmt w/Presidio Networked Solutions to Upgrade the City’s Phone System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P R E S I D I Oy SOW#P288-160406 <br /> Version 1.2 <br /> SECTION 3: KEY ASSUMPTIONS <br /> Presidio made the following assumptions when developing this Statement of Work. <br /> These assumptions serve as the foundation to which the project estimate, approach and • <br /> timeline were developed. Any changes to the following assumptions must be processed <br /> using the procedures the section titled "Project Change Control" (Appendix B). <br /> • Additional required tasks discovered after the execution of this SOW that are not <br /> mentioned in this SOW will require a change order <br /> • Defective equipment provided by City of Sunny Isles utilized for this solution that <br /> require Presidio additional hours of troubleshooting will require a change order <br /> • Troubleshooting issues due to City of Sunny Isles configuration changes after <br /> milestone signoff will require a change order <br /> • Presidio will perform most of the Services under this Statement of Work during <br /> normal business hours, 8:00 a.m. to 5:00 p.m. (local time) Monday through <br /> Friday, except Presidio holidays, unless otherwise specified. <br /> • Presidio will be provided all required physical access to the City of Sunny Isles <br /> facilities (identification badge, escort, parking decal, etc.) as required by City of <br /> Sunny Isles policies. <br /> • Some of the Services provided may be performed during the night shift and <br /> weekends. City of Sunny Isles will provide the required access to systems and <br /> resources. <br /> • City of Sunny Isles is responsible for all transport of equipment from receiving <br /> area(s) to the data center(s) and/or equipment rooms where it will be installed. <br /> • City of Sunny Isles is responsible for the condition and readiness of the electrical <br /> power distribution plant and the correction of any anomalies and/or deficiencies. <br /> • City of Sunny Isles is responsible for providing all patch cables (copper and fiber <br /> optic) unless specifically indicate in the bill of materials <br /> • City of Sunny Isles is responsible for providing adequate rack space, power, <br /> environmental controls, data wiring, engineering/staging workspace and any <br /> other access required for completion of this project. <br /> • Some activities on this project may be performed on Presidio's premises. <br /> • Presidio may engage subcontractors and third parties in performing a portion of <br /> this work. <br /> • Presidio will not make changes to the configuration of any network equipment <br /> after it has been installed and tested. <br /> 11 <br /> Use or disclosure of data on this page is subject to the restriction on the title page of this proposal. <br /> Presidio Networked Solutions,Inc.SOW Framework v8.0 <br /> SIB <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.