P R E S I D I Oy SOW#P288-160406 <br /> Version 1.2 <br /> SECTION 3: KEY ASSUMPTIONS <br /> Presidio made the following assumptions when developing this Statement of Work. <br /> These assumptions serve as the foundation to which the project estimate, approach and • <br /> timeline were developed. Any changes to the following assumptions must be processed <br /> using the procedures the section titled "Project Change Control" (Appendix B). <br /> • Additional required tasks discovered after the execution of this SOW that are not <br /> mentioned in this SOW will require a change order <br /> • Defective equipment provided by City of Sunny Isles utilized for this solution that <br /> require Presidio additional hours of troubleshooting will require a change order <br /> • Troubleshooting issues due to City of Sunny Isles configuration changes after <br /> milestone signoff will require a change order <br /> • Presidio will perform most of the Services under this Statement of Work during <br /> normal business hours, 8:00 a.m. to 5:00 p.m. (local time) Monday through <br /> Friday, except Presidio holidays, unless otherwise specified. <br /> • Presidio will be provided all required physical access to the City of Sunny Isles <br /> facilities (identification badge, escort, parking decal, etc.) as required by City of <br /> Sunny Isles policies. <br /> • Some of the Services provided may be performed during the night shift and <br /> weekends. City of Sunny Isles will provide the required access to systems and <br /> resources. <br /> • City of Sunny Isles is responsible for all transport of equipment from receiving <br /> area(s) to the data center(s) and/or equipment rooms where it will be installed. <br /> • City of Sunny Isles is responsible for the condition and readiness of the electrical <br /> power distribution plant and the correction of any anomalies and/or deficiencies. <br /> • City of Sunny Isles is responsible for providing all patch cables (copper and fiber <br /> optic) unless specifically indicate in the bill of materials <br /> • City of Sunny Isles is responsible for providing adequate rack space, power, <br /> environmental controls, data wiring, engineering/staging workspace and any <br /> other access required for completion of this project. <br /> • Some activities on this project may be performed on Presidio's premises. <br /> • Presidio may engage subcontractors and third parties in performing a portion of <br /> this work. <br /> • Presidio will not make changes to the configuration of any network equipment <br /> after it has been installed and tested. <br /> 11 <br /> Use or disclosure of data on this page is subject to the restriction on the title page of this proposal. <br /> Presidio Networked Solutions,Inc.SOW Framework v8.0 <br /> SIB <br /> • <br />