Laserfiche WebLink
NORTH BAY ROAD PEDESTRIAN EMERGENCY BRIDGE AND MmGATION <br /> Total 410% <br /> Estimated Construction Cost $5.600,000 $155,000 5235,000 $484938 5266,000 Contingency <br /> 57,413,432 <br /> fridge Structure& <br /> Professional Services,Construction Approaches North Seawall FPL Seagrass Mangroves Total <br /> Management&Inspection <br /> Has Rate Total !Rs Rate Total Hrs Rate -Total Sirs Rate Total Firs Rate Total <br /> Coo.trcdion Mgmt.Inspection(CGA) VS 5252,750 VS 515,0000 VS 523,500 VS $20000 I/S 515,000 5325,250 <br /> Constrsdion Eng,eer'etg Inspection(CGA) Lis $161,000 45 56,000 5165,000 <br /> Structural FOR(ASA) VS $92,000 VS $16,500 5103,SCO <br /> CFA Englneerhg(APR) Les $25,230 $25,2C0 <br /> Electrical(C5A) L/S 56,670 VS 58,120 514,750 <br /> • Landscape(CGA) VS 515,760 $13,760 <br /> Esrrironmental ICGA) VS 7,030 <br /> Environmental Consultant VAS) V5 $12,075 I/S 522.000 L/5 $11,500 $45,575 <br /> Geotedtn!al Engineer of Record 1/S $2,500 52,500 <br /> Meteriah Testing Services VS $45,005 V5 $3,000 $45.000 <br /> Surveying Serapes US $7,000 1/5 52,000 <br /> Government Services VS 549}00 515 53,220 L/5 $11,020 565,540 <br /> $450,073 $47,220 $44,640 542,000 562,260 $034,155 <br /> O <br /> These fee estimates are based on Hourly to Maximum fee schedule. <br /> Design,Sum/8 Materials Testing: $85,580 <br /> Construction Managerent&Inspection: $752,635(1096) <br /> • <br /> latch $834,195 <br /> Note:The duration of the services Included Is thirteen months.Additional Construction Management 8 Inspection Services beyond the stipulated duration vrlII be haled at the rate of 535,000.03 monthly. <br /> • <br /> • <br /> SIB <br />