My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Maser Consulting
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-06-01) Shoreline Surveying and Mapping Consulting Services
>
Responses
>
Maser Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 9:32:15 AM
Creation date
6/28/2016 9:30:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Des Moines Airport HDS Survey <br />City of Des Moines, Polk County, IA <br />Lead Surveyor responsible for using HDS laser scanning to collect point cloud information at a density of 0.2ft grid <br />or better along the project extents. Provided full topographic survey for over 15,000 LF of paved areas including <br />Runways and Taxiways for resurfacing design. Extracted data from the resulting point cloud information including <br />edges and centerline of all taxiway and runway connectors, pavement joints patterns, paint strip detail and visible <br />utility structure detail. Using this extracted information, produced deliverables consisting of Civil3D planemetric <br />features and accurate DTMs of all surface areas. <br /> <br />3D Modeling and Geodatabase Creation, Centers for Disease Control and Prevention <br />City of Chamblee, DeKalb County, GA <br />Surveyor responsible for 3D modeling the HDS data cloud information for the overhead steam and chilled water <br />pipes and incorporating this information into an ArcGIS database for use by the CDC for future onsite <br />development and asset management. Utilizing Trimble data collection, collected, attributed, and drew connectivity <br />of all underground utilities in a real-time environment. <br /> <br />Task Order 1 - I-285 East to I-75 South Ramp Alignment <br />Clayton County, GA <br />Surveyor responsible for analysis and processing of HDS field data for over two miles of I-75 & I-285 and <br />managing the field portion of the survey, extracting 3D data of five lanes of highway and model seven bridges <br />along the highway corridor. The data was collected utilizing Leica Geosystems C-10 HDS laser scanner. By using <br />this technology was able to survey two high traffic throughways without invasive procedures, minimizing filed <br />traffic incursions and increasing the safety of its personal. <br /> <br />Task Order 02 - I-40 Eastbound Truck Climbing Lane <br />Smith County, TN <br />Surveyor responsible for analysis and processing of HDS field data for over three miles of I-40 Eastbound, <br />managing the field portion of the survey and completing all computations of the HDS data to create the as-built <br />surface of the highway and adjacent planemetric features. This project included topographic data collection, utility <br />location, right-of-way construction, and bridge detail location to design truck climbing lanes for one of <br />Tennessee’s busiest highways. Due to the congestion and safety concerns, implemented HDS scanning to <br />accurately gather topographic information safely and without hindering traffic flow or closing highway lanes. <br />LOR Page 24 of 52
The URL can be used to link to this page
Your browser does not support the video tag.