My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Land & Sea Surveying
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-06-01) Shoreline Surveying and Mapping Consulting Services
>
Responses
>
Land & Sea Surveying
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 9:49:08 AM
Creation date
6/28/2016 9:47:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 | P a g e <br />RFQ #16-06-01 Shoreline Surveying & Mapping Consulting Services <br /> <br />Turkey Creek Dredging/Muck Removal Project – Project Manager/Professional Surveyor Having performed <br />vibracore sampling for Brevard County for preparation of the bid documents, Land & Sea Surveying was <br />very familiar with this project. We are now working with the dredger and completed the pre-dredge <br />surveys and muck probes for quantity of material to be removed. <br /> <br />Sebastian Inlet Semi Annual Survey – Project Manager/Professional Surveyor Land & Sea Surveying <br />provides a full survey of the inlet including beach profiles for 6 miles to the north and south of the inlet and <br />into the intra-coastal waterway every 6 months for the past 11 years. The project also includes a multi- <br />beam survey of the reef area. The surveys are performed for monitoring of sand movement as well as sand <br />budget calculations. <br /> <br />Titusville Railroad Bridge <br />Survey – Project <br />Manager/Professional <br />Surveyor Land & Sea <br />performed a magnetometer, <br />side scan sonar and <br />bathymetric survey of this <br />area surrounding the west <br />landing of the bridge and <br />supports to show any <br />possible buried debris with a <br />complete picture of existing <br />conditions. <br /> <br />State Road 405 Bridge Submerged Cable Location – Project Manager/Professional Surveyor <br />Land & Sea Surveying located and marked the horizontal position of an existing submerged utility conduit. <br />The location was achieved by sending an electric tone through the conduit from the landing on one side <br />with a ground on the opposite side of the river. The resultant electromagnetic field was then located with a <br />vessel-mounted receiver using HYPACK for positioning. <br /> <br />Port Canaveral Channel Widening Project – Project Manager/Professional Surveyor Land & Sea Surveying is <br />working with Dutra Group and GLF Construction on this project. Dutra is performing the dredging and GLF <br />is performing the upland cut back the construction of a DMMA. Land & Sea Surveying is monitoring the <br />dredging operations to confirm when the template depth is met. Surveys are being performed using single <br />beam and multi-beam technologies. We have also surveyed the upland area to verify conformance with the <br />design template. Mr. Carlile has calculated quantities and has been providing the dredger with HYPACK <br />target files for high areas. <br /> <br />Port Canaveral Cruise Terminal 6 – Hydrographic Surveyor Land & Sea Surveying provided a multi-beam <br />survey of the CT-6 berth to determine existing conditions showing where ships propellers and side- <br />thrusters create a washout area near the berth wall and created high spots of material reducing the <br />minimum clearance under the ships. The survey was also used for bide document for the installation of <br />scour mats at the berth. <br /> <br />Magnetometer, side scan sonar and <br />bathymetric survey of the railroad <br />bridge in Titusville, Florida.
The URL can be used to link to this page
Your browser does not support the video tag.