Laserfiche WebLink
32 | P a g e <br />RFQ #16-06-01 Shoreline Surveying & Mapping Consulting Services <br /> 1998 Beach Project Monitoring – Coastal Systems conducted the required physical and biological <br />monitoring of the beach project for four years post-construction. <br /> <br />  2002 Boca Inlet Technical Advisory Committee (TAC) – Coastal Systems represented the Town on <br />this technical committee facilitated by the Florida DEP. <br /> 2004 & 2005 Hurricane Impact Assessments – Coastal Systems consulted with the Town to assess <br />hurricane impacts to the beaches within the Town. In 2004, Coastal Systems secured approximately <br />$3.1M in beach nourishment funding from FEMA. This funding was utilized for the <br />design/permitting and construction of the 2011 beach nourishment project. <br /> Broward County Segment III – Coastal Systems provided coastal engineering consulting on behalf of <br />the Town relative to the use of borrow areas offshore of Hillsboro and Deerfield Beach by the <br />County for the Segment III (south of Port Everglades) beach restoration project constructed by the <br />County in 2005/2006. <br /> 2007 Truck Haul Nourishment – Coastal Systems assisted the Town with this “Project of <br />Opportunity” to utilize excavated sand, in accordance with the Town’s ordinance, for a 5,000 cy <br />maintenance project in the northern section of the Town. Coastal Systems designed, permitted, <br />and did construction administration of the project. <br /> 2012 Coastal Structure Study – Coastal Systems conducted numerical modeling of coastal structural <br />alternatives to address the downdrift erosion from the groin field in Deerfield Beach. Alternatives <br />were addressed in terms of coastal engineering performance and environmental permit feasibility. <br />A series of submerged breakwaters were determined to be feasible for the transition downdrift of <br />the groin field <br /> <br />