My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bowman
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-06-01) Shoreline Surveying and Mapping Consulting Services
>
Responses
>
Bowman
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 4:12:38 PM
Creation date
6/28/2016 10:11:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
bowmanconsulting.com <br />John B. Smith PSM <br />Hydrographic Project Surveyor <br />Education <br /> BS, Geomatics, University of Florida, <br />1998 <br />Professional Registrations <br /> Professional Surveyor & Mapper: Florida <br />(7002)Sarasota County Topographic and Hydrographic Survey, Sarasota County, Florida <br />Mr. Smith served as Party Chief for this project which consisted of 71 profiles extend- <br />ing 3,000 feet off shore and 150 feet landward of the monument stations provided. The <br />final deliverable to the US Army Corps of Engineers consisted of Hypack and GPS <br />project raw and edited files along with supporting documentation. <br />Captiva SPP Topographic and Hydrographic Survey, Lee County, Florida <br />Mr. Smith served as Party Chief for this project that consisted of 66 profiles extending <br />3,000 feet off shore and 150 feet landward of the monument stations provided. The final <br />deliverable to the US Army Corps of Engineers consisted of Hypack and GPS project <br />raw and edited files along with supporting documentation. <br />Bathymetric Surveys of Sebastain Inlet, Indian River County, Florida <br />Mr. Smith served as Party Chief on this project, responsible for performing bathymet- <br />ric surveys for both the Inlet and connecting portions of Indian River. He a utilized <br />dual frequency echo sounder in conjunction with GPS navigation and positioning sys- <br />tems to develop bottom profiles and sediment thickness maps for subsequent scientific <br />and construction activities. A 3-mile section of the beach was also surveyed from 3,000 <br />feet offshore to the top of the dune to aid in the planning for spoil disposal from pro- <br />posed inlet dredging. <br />Brevard County Topographic & Hydrographic Survey, Brevard County, Florida <br />Mr. Smith served as Party Chief for this project that consisted of 140 profiles extending <br />3,000 feet off shore and 150 feet landward of the monument stations provided. The final <br />deliverable to the US Army Corps of Engineers consisted of Hypack and GPS project <br />raw and edited files along with supporting documentation. <br />Survey 12-155, Tamiami Trail Modifications Project Construction, Support Topo- <br />graphic Survey, Miami-Dade County, Florida <br />Mr. Smith served as Party Chief for this project that consisted of horizontal, verti- <br />cal control, hydrographic and as-built surveys for 11 miles. The deliverable to the US <br />Army Corps of Engineers consisted of Hypack and GPS and terrestrial project files <br />along with supporting documentation. The project is currently still in progress. <br />Mr. Smith has over 12 years of experience in all aspects of surveying including <br />hydrographic, topographic, GPS and boundary surveying. Mr. smith is a Hypack <br />Certified Hydrographer and has an extensive background in single beam and multi- <br />beam surveying. <br />Page 42
The URL can be used to link to this page
Your browser does not support the video tag.