Laserfiche WebLink
PROJECT EXPERIENCE <br />Leeward Mega Yacht Marina, Turks and Caicos Yacht Club - Providenciales, Turks & Caicos <br />fin Hydrographic was <br />the engineer and surveyor on the job <br />and was responsible for the survey <br />layout of all bulkheads and pilings, <br />preconstruction and post <br />construction hydrographic surveys <br />and channel dredging design <br />drawings. OHS performed all pre <br />and post construction hydrographic <br />payment surveys and checked the <br />contractor's payment applications. <br />OHS staff used its own survey <br />vessels and also rode along side the <br />contractor's surveyors to ensure <br />accurate data collection. OHS <br />utilized HYPACK Hydrographic <br />Navigation software and an automated tide gauge and established a local coordinate system for <br />the work using Trimble RTK GPS. David Olin, P.E. did spot dive inspections on high spots that <br />were found that had been missed to develop a completion checklist. Additional surveys were <br />performed after two hurricanes hit the island within one week. New quantity calculations were <br />performed based on the new survey data. <br />Mail www.01!nHydrographic.com <br />Consulting Engineering, Environmental, and Mapping Services <br />5olu'9% s enc <br />