Laserfiche WebLink
CURRENT CLIENT LIST <br />Current Projected workload: <br />Royal Caribbean <br />1 week of field work possible this summer to find alternate sand source in Freeport. <br />Proposal Stage <br />Fisher Island Community Association <br />1x weekly inspection at Terminal Island Seawall Project currently under <br />construction. <br />Flagstone Property Group (Island Gardens) <br />One remaining one day Multibeam Mitigation Artificial Reef survey is scheduled for <br />the week of July 4, 2016. <br />Anchor Bay Bulkhead Replacement <br />1x weekly inspection. Not yet under construction <br />Recent Completed 2016 Project Client List; <br />Moffatt & Nichol- Beach Surveys, Beach Cleanup Mitigation, Bulkhead Inspections <br />Deering Bay Community Association- Marina Piling Replacement Project <br />Kearns Construction — Multibeam Surveys and Crane Barge HYPACK Support <br />Great Lakes Dredge and Dock — numerous Turbidity Monitoring Projects <br />Town of Palm Beach — Turbidity Monitoring Consultant for Phipps Ocean Park Beach <br />Nourishment <br />Paccom — Numerous Survey Stakeout and As Built Jobs <br />Shoreline Foundation — Coral Relocation, Environmental Mapping and Hydrographic <br />Surveying <br />Lennar Homes -- Dual Frequency Hydrographic Surveys of Lakes in Miami <br />www.01inHydrographic.com <br />U4, Consulting Engineering, Environmental, and Mapping Services <br />yragrap is <br />Solutions, Inc. <br />