|
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Brady Walker
<br />
<br />13. ROLE IN THIS CONTRACT
<br /> Environmental Scientist
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br /> 12
<br />b. WITH CURRENT FIRM
<br /> 11
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Kimley-Horn and Associates, Inc., Delray Beach, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelor of Science / Biology
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Society of Wetland Scientists
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lloyd Estates Streetscape and Drainage Improvements, Oakland
<br />Park, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (If Applicable)
<br />2013
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm
<br />Analyst for the Kimley-Horn team that provided professional engineering services for the design and construction of the Lloyd
<br />Estates Residential and Industrial Area Drainage Project. The project involves phased drainage and water distribution system
<br />improvements consisting of the construction of a stormwater collection system with water quality treatment measures and
<br />possible upgraded outfalls, as well as replacement of select existing water mains within the project area. The professional
<br />services include surveying, stormwater analysis, civil and electrical engineering design, landscaping and irrigation, permitting,
<br />coordinating with utility providers for adjustments and or relocations, preparing quantity calculations, and engineer’s estimates
<br />of probable costs.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Royal Palm Boulevard Improvements (Royal Palm Blvd. Bridge
<br />over Margate Canal), Margate, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2010
<br />CONSTRUCTION (If Applicable)
<br />2010
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm
<br />Environmental analyst for this project that involved realignment of the roadway, east- and westbound left turn lanes, access
<br />management modifications, renovation of an existing bridge and medians, construction of pedestrian bridges, base
<br />enhancements, milling and resurfacing, providing new asphalt areas, swale improvements, drainage improvements,
<br />landscaping, irrigation, and lighting improvements. The work included design of a roadway bridge and two pedestrian bridges,
<br />roadway and turn lanes, drainage, signing and pavement markings, government agency approvals, coordinating with utility
<br />providers for adjustments and or relocations, preparing detailed quantity calculations and engineers estimates of probable
<br />costs, and providing resident project representation and incidental items.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Oakland Park Environmental Services (Cherry Creek
<br />Environmental Assessment and Dredging & Sleepy River
<br />Dredging), Oakland Park, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011
<br />CONSTRUCTION (If Applicable)
<br />2011
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm
<br />Served as project analyst. Provided project management, environmental assessment, and permitting services for the City of
<br />Oakland Park. Environmental services included conducting an alternatives analysis and environmental assessment of Cherry
<br />Creek and Coral Lakes headwaters, permit support documentation to dredge portions of the water and preparation of
<br />associated mitigation plans, and support during the bidding process, as well as construction phase services during the duration
<br />of the contractor's work to maintain permit compliance.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />I-75 (SR 93) from Hernando County Line to CR 470, FDOT District
<br />Five
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If Applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm
<br />Environmental analyst. Kimley-Horn is preparing plans and permits for the widening of 12 miles of I-75 from north of the
<br />Hernando County line to south of CR 470 for FDOT District Five. The project includes widening in the median of I-75, and
<br />reconstruction of the SR 48 interchange and the northbound off ramp to SR 476B. The project also includes off-site drainage
<br />ponds and right-of-way acquisition.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Mowry Drive Roadway Improvements, Homestead, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (If Applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm
<br />Served as project analyst for for the new construction and widening of Mowry Drive (SW 320th Street) from SW 157th Avenue
<br />to SW 152nd Avenue. The existing roadway consisted of a one-lane paved road and was proposed to be converted to a four-
<br />lane divided urban section with bike lanes on both sides. The project included design and preparation of roadway, drainage,
<br />signing and marking, lighting, water main extension, landscaping and irrigation plans. As part of the project, environmental and
<br />drainage permits were obtained from SFWMD, RER and USACE. The project also included preparation of bid documents and
<br />construction supervision.
<br /> STANDARD FORM 330 (REV. 3/2013) PAGE 2
|