Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Brady Walker <br /> <br />13. ROLE IN THIS CONTRACT <br /> Environmental Scientist <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 12 <br />b. WITH CURRENT FIRM <br /> 11 <br />15. FIRM NAME AND LOCATION (City and State) <br />Kimley-Horn and Associates, Inc., Delray Beach, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science / Biology <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Society of Wetland Scientists <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Lloyd Estates Streetscape and Drainage Improvements, Oakland <br />Park, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION (If Applicable) <br />2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Analyst for the Kimley-Horn team that provided professional engineering services for the design and construction of the Lloyd <br />Estates Residential and Industrial Area Drainage Project. The project involves phased drainage and water distribution system <br />improvements consisting of the construction of a stormwater collection system with water quality treatment measures and <br />possible upgraded outfalls, as well as replacement of select existing water mains within the project area. The professional <br />services include surveying, stormwater analysis, civil and electrical engineering design, landscaping and irrigation, permitting, <br />coordinating with utility providers for adjustments and or relocations, preparing quantity calculations, and engineer’s estimates <br />of probable costs. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Royal Palm Boulevard Improvements (Royal Palm Blvd. Bridge <br />over Margate Canal), Margate, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If Applicable) <br />2010 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Environmental analyst for this project that involved realignment of the roadway, east- and westbound left turn lanes, access <br />management modifications, renovation of an existing bridge and medians, construction of pedestrian bridges, base <br />enhancements, milling and resurfacing, providing new asphalt areas, swale improvements, drainage improvements, <br />landscaping, irrigation, and lighting improvements. The work included design of a roadway bridge and two pedestrian bridges, <br />roadway and turn lanes, drainage, signing and pavement markings, government agency approvals, coordinating with utility <br />providers for adjustments and or relocations, preparing detailed quantity calculations and engineers estimates of probable <br />costs, and providing resident project representation and incidental items. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Oakland Park Environmental Services (Cherry Creek <br />Environmental Assessment and Dredging & Sleepy River <br />Dredging), Oakland Park, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (If Applicable) <br />2011 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Served as project analyst. Provided project management, environmental assessment, and permitting services for the City of <br />Oakland Park. Environmental services included conducting an alternatives analysis and environmental assessment of Cherry <br />Creek and Coral Lakes headwaters, permit support documentation to dredge portions of the water and preparation of <br />associated mitigation plans, and support during the bidding process, as well as construction phase services during the duration <br />of the contractor's work to maintain permit compliance. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />I-75 (SR 93) from Hernando County Line to CR 470, FDOT District <br />Five <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If Applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Environmental analyst. Kimley-Horn is preparing plans and permits for the widening of 12 miles of I-75 from north of the <br />Hernando County line to south of CR 470 for FDOT District Five. The project includes widening in the median of I-75, and <br />reconstruction of the SR 48 interchange and the northbound off ramp to SR 476B. The project also includes off-site drainage <br />ponds and right-of-way acquisition. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Mowry Drive Roadway Improvements, Homestead, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION (If Applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Served as project analyst for for the new construction and widening of Mowry Drive (SW 320th Street) from SW 157th Avenue <br />to SW 152nd Avenue. The existing roadway consisted of a one-lane paved road and was proposed to be converted to a four- <br />lane divided urban section with bike lanes on both sides. The project included design and preparation of roadway, drainage, <br />signing and marking, lighting, water main extension, landscaping and irrigation plans. As part of the project, environmental and <br />drainage permits were obtained from SFWMD, RER and USACE. The project also included preparation of bid documents and <br />construction supervision. <br /> STANDARD FORM 330 (REV. 3/2013) PAGE 2