|
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Benjamin Johnson
<br />13. ROLE IN THIS CONTRACT
<br />Landscape Architecture Analyst / Site Master Planning /
<br />Urban Design / Active and Passive Park Design /
<br />Streetscape Planning and Design
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br /> 5
<br />b. WITH CURRENT FIRM
<br /> 1
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Kimley-Horn and Associates, Inc., Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelor of Landscape Architecture / Landscape Architecture
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />American Society of Landscape Architects (ASLA), Greater Miami Chamber of Commerce (GMCC)
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Regatta Park, Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If Applicable)
<br />2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm
<br />Served as landscape architecture analyst for the Kimley-Horn team that provided landscape architecture services for Regatta
<br />Park in the City of Miami, a new15 acre waterfront passive park that will transform the underutilized waterfront into a more
<br />cohesive and vibrant public space that will help connect the general public to the waterfront. The main features of the park
<br />include the Expo Lawn, Regatta Lawn, Tropical Gardens, Promenade, Multi-use Path Connector, Tree Alee and Children’s Play
<br />Area. Kimley Horn was tasked with the landscape architectural and civil engineering design of the park from concept through
<br />construction administration.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Miami Coral Way Medians, Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If Applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm
<br />Serving as landscape architecture analyst for the conceptual plans, exhibits, and construction drawings of the landscape
<br />improvements within 2.5 miles of existing Coral Way medians between SW 12th Avenue and SW 37th Avenue. Key to the
<br />design is the preservation of the existing historic Banyan Trees and the integration of proposed shrubs and groundcovers
<br />around them in order to create an iconic look for this important roadway within Miami Dade County.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />South Miami Intermodal Transportation Plan (ITP), South Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If Applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm
<br />Serving as landscape architecture analyst on the Kimley-Horn team that prepared the South Miami Intermodal Transportation
<br />Plan (SMITP). The City of South Miami desires to enhance the existing transportation system and mobility choices available to
<br />residents, workers, and visitors to the City. An integral component of this effort is to establish and implement the SMITP, which
<br />identifies an interconnected network of mobility and safety improvements based on smart growth and complete streets
<br />principles.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami Worldcenter, Miami, FL (2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2009
<br />CONSTRUCTION (If Applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm
<br />Serving as landscape architecture analyst on the Kimley-Horn team. Kimley-Horn partnered with a private developer, the City of
<br />Miami, the Miami Community Redevelopment Agency (CRA), and other stakeholders in preparing typical sections for
<br />streetscapes for the City’s largest proposed downtown project. Kimley-Horn also partnered with numerous utility companies to
<br />determine existing underground conditions. Once this information was obtained, we worked with multiple stakeholders to
<br />develop and evaluate various streetscape options for roads and avenues within the multi-block project limits.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />North Bay Village Baywalk Plaza Area Design,
<br />North Bay Village, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If Applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm
<br />Served as landscape architecture analyst for the Kimley-Horn team - As prime consultant, Kimley-Horn and Associates Inc.
<br />provided North Bay Village with landscape architecture and civil engineering services for the site improvements to separate
<br />plaza areas and connector boardwalk under the east bridge along JFK Causeway. Services include the design of landscape
<br />architectural components including hardscape, landscape, site furniture, site lighting and irrigation from concept through
<br />construction. Part of the design elements of the project includes an iconic “sail structure” to serve as a focal point.
<br /> STANDARD FORM 330 (REV. 3/2013) PAGE 2
<br />
|