My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn submittal for RFQ 16-06-02 LA Services
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-06-02) Landscape Architect Services (Final)
>
Responses
>
Kimley-Horn submittal for RFQ 16-06-02 LA Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2016 10:55:31 AM
Creation date
7/18/2016 10:52:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br /> 2 <br />21. TITLE AND LOCATION (City and State) <br />City of Miami Miscellaneous Landscape Architecture <br />Services, Miami, FL <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (if Applicable) <br /> <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />City of Miami Capital Improvements <br />Program (CIP) <br />b. POINT OF CONTACT NAME <br />Maria Pineda <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 224-4770 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Kimley-Horn is providing the City of Miami with landscape architecture services at various project sites throughout the <br />City. Services include the design of landscape architectural components including hardscape, landscape, site furniture, <br />site lighting and irrigation for different project types including parks, streetscapes, and other related urban public realm <br />areas from concept through construction. The contract is being funded through The City of Miami Capital <br />Improvements Program (CIP). <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br /> <br />Kimley-Horn and Associates, Inc. <br />(2) FIRM LOCATION (City and State) <br /> <br />Miami, FL <br />(3) ROLE <br /> <br /> Project Management, Landscape Architecture <br />b. <br />(1) FIRM NAME <br /> <br />Kimley-Horn and Associates, Inc. <br />(2) FIRM LOCATION (City and State) <br /> <br />Coral Gables, FL <br />(3) ROLE <br /> <br />Project Management, Landscape Architecture <br />c. <br />(1) FIRM NAME <br /> <br />Kimley-Horn and Associates, Inc. <br />(2) FIRM LOCATION (City and State) <br /> <br />West Palm Beach, FL <br />(3) ROLE <br /> <br />Landscape Architecture <br /> STANDARD FORM 330 (REV. 3/2013) PAGE 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.