My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WANTMAN GROUP RFQ 16-06-02
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-06-02) Landscape Architect Services (Final)
>
Responses
>
WANTMAN GROUP RFQ 16-06-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2016 11:06:44 AM
Creation date
7/18/2016 11:03:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAND DESIGN SERVICES DIVISION <br />LANDSCAPE ARCHITECTURE // PLANNING // ENVIRONMENTAL // TRANSPORTATION // ENGINEERING // SURVEY <br />SUBSURFACE UTILITY ENGINEERING // STRUCTURES // WATER RESOURCES // CREATIVE SERVICES <br />Under its continuing service contract with the City of <br />Coconut Creek for Urban Planning and Landscape <br />Architecture, WGI’s Land Design Services Division <br />created the park design for a new portion of Sabal <br />Pines Park, located in the City of Coconut Creek. Park <br />improvements include a t-ball field, coach pitch field, <br />and a multi-purpose field. <br />Scope of services includes preparation of landscape <br />plan, site plan, approval from regulatory agencies, <br />preparation of bid documents, and construction <br />management services. The project was completed in <br />February 2013. <br />SABAL PINES PARK <br />CONTINUING SERVICES FOR URBAN <br />PLANNING AND LANDSCAPE ARCHITECTURE <br />LOCATION: <br />Coconut Creek, Florida <br />REFERENCE: <br />City of Coconut Creek <br />Sheila Rose <br />4800 West Copans Road <br />Coconut Creek, Florida 33063 <br />Phone: 954.973.6756 <br />DATE STARTED: <br />Design June 2010 <br />Construction October 2012 <br />DATE COMPLETED: <br />Design October 2011 <br />Construction February 2013 <br />TOTAL COST: <br />Design $50K <br />Construction $1M <br />PROJECT MANAGER: <br />Doug Murray, RLA <br />Page 16
The URL can be used to link to this page
Your browser does not support the video tag.