Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Cristobal Betancourt, RLA <br />13. ROLE IN THIS CONTRACT <br />Project Manager <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 21 <br />b. WITH CURRENT FIRM <br /> 5 <br />15. FIRM NAME AND LOCATION (City and State) <br />Chen Moore and Associates, Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science / Landscape Architecture <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />FL / Registered Landscape Architect/ NJ / Registered <br />Landscape Architect/ NY/ Registered Landscape Architect <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Betancourt is Chen Moore and Associates’ Director of Landscape Architecture and Planning. He has experience providing <br />planning and landscape architecture design solutions for public and private sector clients. Mr. Betancourt provides a full range of <br />services starting with due diligence and master planning culminating in detailed site design. He is well versed in the use of low- <br />impact development techniques applied to site planning. <br /> <br />alternate <br />Mr. Betancourt has experience providing planning and landscape architecture design solutions for public and private sector cl ients <br />throughout the Treasure Coast. His team provides a full range of services starting with due diligence and master planning <br />culminating in detailed site design. He is well versed in the use of low-impact development techniques specifically applied to site <br />planning. Cris has lead multi-discipline teams for parks and recreation facilities throughout Florida, providing design, permitting, and <br />construction observation services for many types of improvements, including athletic fields; pedestrian, bicycle, an d equestrian <br />trails; site amenities; themed wayfinding; amphitheaters; landscape; hardscape; and irrigation. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Jefferson Street Dune Restoration <br />Hollywood, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />On-Going <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Senior Project Manager. CMA is providing landscape architecture services for the restoration of the dune system accessed <br />from Jefferson Street in Hollywood. CMA is responsible for performing a field inventory of existing vegetation on the dune; <br />performing an erosion Control and Vegetation Disposition Plan; creating a proposed planting plan and details; and permitting <br />through the Florida Department of Environmental Protection. CMA will also provide construction administration. Fee $ 14,000 <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Margate Dog Park <br />Margate, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If Applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Senior Project Manager. CMA is providing professional design services for the Margate Dog Park Project. The proposed <br />elements to be incorporated into the proposed Margate Dog Park include: shade structures/shelters; on -site paved parking lots; <br />concrete walkways; brick paver donor memorial area for fundraising; perimeter fencing with double lock gate system; site <br />furnishing (benches, trash/recycle bins, drinking fountains, dog wash stations, waste bag stations); landscaping/irrigatio n <br />improvements; stormwater improvements; and water service connections. Fee $ 53,870 <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Downtown Coral Springs Streetscaping <br />Coral Springs, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If Applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager. CMA was contracted by the City of Coral Springs to assist the Coral Springs CRA in the planning, design, <br />permitting and construction support of various streetscaping improvements in Downtown Coral Springs. As the prime <br />consultants, CMA provided civil engineering, landscape architecture, environmental permitting and construction engineering <br />and inspection services for the project. The project included implementing Complete Street concepts for NW 31st Court, NW <br />94th Avenue and NW 32nd Street. Cost $ 4,100,000.00 Fee $ 235,739.98 <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Westside Park Baseball Field <br />Deerfield Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (If Applicable) <br />2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager. CMA provided design, permitting and construction engineering inspection services for the conversion of an <br />existing football field and multi-purpose field into one Babe Ruth Baseball field, one Little League Baseball field, and one <br />practice baseball field for the City of Deerfield Beach Parks and Recreation Department. CMA was responsible for providing <br />survey, geotechnical, site planning, civil engineering, landscape architecture, MEP and structural engineering services. The <br />scope of the project included the layout of the baseball fields with supporting services such as lighting, dugouts, scoreboards <br />and irrigation. The project also included general improvements to the park around the baseball fields including better pedest rian <br />access, ADA parking and sidewalk improvements, native landscaping, outdoor seating areas and stormwater improvements. <br />Cost $ 1,600,000.00 Fee $ 72,865.00 <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Euclid Streetscape Improvements (Lincoln Center Building), FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION (If Applicable) <br />2012 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager CMA is providing civil engineering and landscape architecture services for the pedestrianizing of Euclid <br />Avenue. This stretch of road will be incorporated into the historic pedestrian street known as Lincoln Road Mall. The project is <br />funded by the City of Miami Beach through a developer’s agreement with Lincoln Center Associates which owns the retail <br />building at the intersection of Euclid Avenue with Lincoln Road. The project requires coordination with various agencies <br />including the City of Miami Beach Planning Department, Public Works, Greenspace management, and Capital Improvements, <br />as well as Miami-Dade County Environmental Protection, Traffic, and Utilities. Cost $ 500,000.00 Fee $ 60,000.00 <br /> STANDARD FORM 330 (6/2004) PAGE 2