<br /> STANDARD FORM 330 (6/2004)
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />
<br />12. NAME
<br />Caleb Rothenberger, R.L.A., LEED AP
<br />13. ROLE IN THIS CONTRACT
<br />Landscape Architect
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />8
<br />b. WITH CURRENT FIRM
<br />2
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelors of Landscape Architecture, Ball State University,
<br />College of Architecture and Planning, Muncie, Indiana | 2007
<br />Minor in Digital Publishing and Graphic Design
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Registered Landscape Architect
<br />Florida Registration No. 6667250 (2015)
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />LEED Accredited Professional, United States Green Building Council, 2009
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Bicycle/Pedestrian Greenway & Trails Master Plan
<br />Sunrise, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Rothenberger assisted with the planning and exhibit creation for the preparation of the Bicycle / Pedestrian
<br />Greenways & Trails Master Plan. The Plan defines a system of sidewalks, bike lanes, paths, greenways and trails within
<br />the City of Sunrise that provides integrated and continuous corridors for non-motorized transportation and recreation
<br />throughout the city in a manner that is sensitive to the needs of various user groups.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Welleby Park
<br />Sunrise, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If applicable)
<br />To be Determined
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Rothenberger contributed to the design of recent renovations which included redesign of the entire pedestrian
<br />system including state-of-the-art fitness stations, distance markers and the widening of the path for a multi-purpose trail.
<br />In keeping with the City’s and CTA’s sustainability values, the multi-purpose trail was constructed using a material
<br />fabricated with recycled tires. This path is comfortable for the users with low impact to joints, pervious to allow water to
<br />recharge the aquifer and also eliminates an impact on the adjacent, mature tree canopy.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Flamingo Park
<br />Sunrise, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Flamingo Park currently consists of athletic fields and a meeting hall. As part of the Parks Capital Improvement Program,
<br />the City of Sunrise added covered basketball courts, installed a rubberized multi-use path, relocated the tennis courts
<br />and constructed a new 4,200 sf meeting hall. Craven Thompson provided site plan design and illustrative renderings
<br />with character imagery. The provided graphics were utilized by the City to help pass the bond needed to provide
<br />funding for the renovations.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Cypress Preserve Park (Previously called Oakland Park Passive
<br />Park), Sunrise, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2010
<br />CONSTRUCTION (If applicable)
<br />2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />As Landscape Designer, Mr. Rothenberger was responsible for aspects of the park design as well as the preparation of
<br />the Open space Park management Plan, the design workshops, conceptual site design, Construction Documents and
<br />Construction Management for the City of Sunrise. Currently the project is under construction.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Nob Hill Passive Park
<br />Sunrise, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013
<br />CONSTRUCTION (If applicable)
<br />To Be Determined
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Responsible for assisting in the park design, preparation of the Open space Park management Plan, the design
<br />workshops, conceptual site design, Construction Documents & Construction Management for the City of Sunrise.
<br />5 ǀ Page 6
|