Laserfiche WebLink
<br /> STANDARD FORM 330 (6/2004) <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> <br />12. NAME <br />Caleb Rothenberger, R.L.A., LEED AP <br />13. ROLE IN THIS CONTRACT <br />Landscape Architect <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />8 <br />b. WITH CURRENT FIRM <br />2 <br />15. FIRM NAME AND LOCATION (City and State) <br />Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelors of Landscape Architecture, Ball State University, <br />College of Architecture and Planning, Muncie, Indiana | 2007 <br />Minor in Digital Publishing and Graphic Design <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Registered Landscape Architect <br />Florida Registration No. 6667250 (2015) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />LEED Accredited Professional, United States Green Building Council, 2009 <br /> <br />19. RELEVANT PROJECTS <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Bicycle/Pedestrian Greenway & Trails Master Plan <br />Sunrise, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Rothenberger assisted with the planning and exhibit creation for the preparation of the Bicycle / Pedestrian <br />Greenways & Trails Master Plan. The Plan defines a system of sidewalks, bike lanes, paths, greenways and trails within <br />the City of Sunrise that provides integrated and continuous corridors for non-motorized transportation and recreation <br />throughout the city in a manner that is sensitive to the needs of various user groups. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Welleby Park <br />Sunrise, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If applicable) <br />To be Determined <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Rothenberger contributed to the design of recent renovations which included redesign of the entire pedestrian <br />system including state-of-the-art fitness stations, distance markers and the widening of the path for a multi-purpose trail. <br />In keeping with the City’s and CTA’s sustainability values, the multi-purpose trail was constructed using a material <br />fabricated with recycled tires. This path is comfortable for the users with low impact to joints, pervious to allow water to <br />recharge the aquifer and also eliminates an impact on the adjacent, mature tree canopy. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Flamingo Park <br />Sunrise, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Flamingo Park currently consists of athletic fields and a meeting hall. As part of the Parks Capital Improvement Program, <br />the City of Sunrise added covered basketball courts, installed a rubberized multi-use path, relocated the tennis courts <br />and constructed a new 4,200 sf meeting hall. Craven Thompson provided site plan design and illustrative renderings <br />with character imagery. The provided graphics were utilized by the City to help pass the bond needed to provide <br />funding for the renovations. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Cypress Preserve Park (Previously called Oakland Park Passive <br />Park), Sunrise, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />As Landscape Designer, Mr. Rothenberger was responsible for aspects of the park design as well as the preparation of <br />the Open space Park management Plan, the design workshops, conceptual site design, Construction Documents and <br />Construction Management for the City of Sunrise. Currently the project is under construction. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Nob Hill Passive Park <br />Sunrise, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (If applicable) <br />To Be Determined <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Responsible for assisting in the park design, preparation of the Open space Park management Plan, the design <br />workshops, conceptual site design, Construction Documents & Construction Management for the City of Sunrise. <br />5 ǀ Page 6