Laserfiche WebLink
<br /> STANDARD FORM 330 (6/2004) <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />3 <br />21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED <br />Miramar Regional Park, Phases I thru III <br />Miramar, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Phase I - 2004 <br />Phase II - 2007 <br />Phase III - Ongoing <br />Phase I - 2005 <br />Phase II - 2008 <br />Phase III <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br /> <br />a. PROJECT OWNER <br />b. POINT OF CONTACT NAME <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />City of Miramar Mr. Luis Lopez, P.E. <br />City Engineer <br />Phone: (954) 602-3316 <br />Email: lalopez@ci.miramar.fl.us <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Craven Thompson and Associates designed the Miramar <br />Regional Park the site as an active regional park. The park is <br />located on 200 acres in western Miramar. <br />The park’s facilities include a 35-acre wetland conservation <br />area, a 28-acre lake system with beach and boat rental facilities; <br />picnic areas and shelters, softball fields, soccer/cricket fields, <br />tennis and basketball courts, a water playground facility, and a <br />swimming pool. <br />Craven Thompson and Associates, Inc. performed all surveying <br />services, designed and permitted dredge and fill plans for the <br />parks water management system, wetland mitigation area and <br />infrastructure facilities which included a water distribution <br />and fire protection system; a sanitary sewer collection system <br />with two lift stations and transmission force main; a drainage <br />system of swales, inlets and culverts to direct runoff to the on - <br />site lake system; and the backbone roadway system and <br />adjacent paved parking areas. Also included were off-site <br />roadway improvements to SW 172nd Avenue and Miramar <br />Parkway to satisfy plat approved turn lane requirements. <br />Estimated Construction Cost: $24,000,000.00. <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. <br />(1) FIRM NAME <br />Craven Thompson & Associates, <br />Inc. <br />(2) FIRM LOCATION (City and State) <br />3563 NW 53rd Street <br />Fort Lauderdale, Florida 33309 <br />(3) Role <br />Prime - Surveying, Landscape Architecture <br />Civil Engineering, and Const. Management <br />b. <br />(1) FIRM NAME <br />The Chappell Group, Inc. <br /> <br />(2) FIRM LOCATION (City and State) <br />714 East McNab Road <br />Pompano Beach, Florida 33060 <br />(3) Role <br />Subconsultant - Environmental Services <br />c. <br />(1) FIRM NAME <br />Masuen Consulting, LLC <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br />5079 N. Dixie Highway, Suite 323 <br />Oakland Park, Florida 33334 <br />(3) Role <br />Subconsultant - Irrigation Design Services <br />5 ǀ Page 9