Laserfiche WebLink
City of Miami Gardens Municipal Complex, Miami Dade County, FL <br />Geotechnical Engineering Services for the construction of 2 replacement culvert crossings and replacement of B-47 including <br />construction of a pre-engineered metal building. <br /> <br />SR-9/I-95 PD&E, south of High Meadows Road to North of Becker Road, Martin and St. Lucie Counties, FL <br />Project included approximately 13 miles of roadway soil survey and testing for drainage features. <br /> <br />I-95/SR-9 PD&E Study, North of Becker Road to south of SR-70, St. Lucie County, FL <br />Project included approximately 13½ miles of roadway soil survey and testing for drainage features. <br /> <br />FLL Site Preparation and NAVAIDS for Runway 9R-27L Broward County, FL <br />Geotechnical Engineering and Construction Materials Testing on the materials being delivered for the construction of the runway <br />expansion. CMT included inspection and quality control. <br /> <br />I-95 Additional Auxiliary Lanes from S. of Glades Road to N. of Yamato Road, Palm Beach County, FL <br />Project consists of approximately 6 miles addition of 2 auxiliary lanes, 2 new interchanges, 25 bridge expansions and new bridges. <br /> <br />82nd Avenue from South of 26th Avenue to CR 510 (Wabasso Road), Indian River County, FL <br />Design and construction of four new bridges with drainage improvements and a new roadway along 82 nd Avenue in Indian River <br />County. The length of the roadway is approximately 7.5 miles through citrus groves and pasture land. <br /> <br />SR-842 Structure Investigation for Bridge Replacement, Broward County, FL <br />Oversight including field exploration/testing and laboratory testing. Construction of two replacement bridges, resurfacing, <br />restoration and rehabilitation, and the replacement of the substandard barrier wall. <br /> <br />SR-817(University Drive) from Nova Drive to I-595 Ramp, Broward County, FL <br />Roadway soil survey and structures investigation, testing for drainage features and mast arm design. <br /> <br />I-75 Express Lanes, Segment E, Broward County, FL <br />Geotechnical engineering services for the improvements along the I-75 (SR9) corridor. The length of the project was about 12 <br />miles. <br /> <br />Broward County Mast Arms, Broward Co., FL <br />Field exploration/testing and laboratory testing for 20 planned intersections for mast arm traffic signal conversions and pavement <br />improvements. Provided laboratory testing, asphalt core services and pavement evaluation. <br /> <br />Port of Miami Tunnel, Off-Site Sign Structures, Miami, FL <br />Geotechnical engineering services to assist in the design of the sign structure foundations. <br /> <br />All Aboard Florida, Orange Co., FL <br />Geotechnical Investigation for the development of an intercity, high-speed passenger railroad system. <br /> <br />Riviera Beach Marina District South, Palm Beach County, FL <br />Geotechnical, Environmental Engineering and Laboratory Testing Services for construction of a Park, Boardwalk Promenade, <br />streets and sidewalks, utility improvements, parking, seawall/retaining wall along the docks and a Marina Events Center. <br /> <br />8 ǀ Page 14