Laserfiche WebLink
21 TITLE AND LOCATION fCiry and State) <br />JU50 519nat0,e Semen Non.101mant <br />fanny testas tieacn, Flo, l3a <br />a. PROJECT OWNER I b. POINT OF CONTACT NAME <br />Sunny Isles Beach Associates; LLC Mr. Ron Choron <br />130 B rK@II AvE,,00 <br />Miami, Florida 33131 <br />EAAMPLEPROJECt RET <br />AOMBER <br />Iz YEAR Ft3MIP[E i Eu <br />PROFESSIONAL SERVICES I CONSTRUCTION jlfapplicable) <br />ongoing ZU14 <br />c POINT OF CONTACT TELEPHONE NUMBER <br />(305) 351-1000 <br />rlcRoronLToRune-network.com <br />44 BRIEF Cc5eRir 110111 vr PROamC i mMI3 RI!rcvr.NCE TO THIS CONTRACT (Include scope, size, and cosr) <br />Coastal Systems provided beach profile surveying services relative to the Florida Department of Envi1o,,,,,e„tal <br />Protection (FDEP) Coastal Construction Control Line (CCCL) permit compliance for the Jade Signature (Project) <br />devel0Y111e,1t located at 16901 C011i1,3 Ave,luc i1, Su....y Isles Beach. Pre -construction beach profile surveys and <br />u,appi,q f0, D,UUU Iu,Ca1 feet of ohoaelu,C vvuie conducted p,io, to the *,,,,t,lCmC,aat;U„ of the proposed truck haul <br />beach nourishment for the Project area. <br />Coastal Systems completed the coastal engineering design of the 35,835 cubic yards (cy) beach fill project. A <br />t,ha5ed-al.,r„vaeh vvaa t„opmed fm the u11Y1errreutaL,U11 of the P,:,ject by t1,.:.,g the 17,820 cy of sand stockpiled <br />tro11, the CACavat►o.,. 111e 1cT11a►nael of the beach fill r.vjeat Waa c0111pleted With the app.oved Comity source of <br />sand from the Ortona Mine. <br />Additionally, Coastal Systems provided consulting services relative to the construction of the project, including <br />CU1151r=iv11 1rlal.s, bid a55i5LaaCC, C0115t1uC6011 adm11u5i1at1v11, construction surveying, volume calculations, and <br />turbidity monitoring. The 111111 also p1OVIU611Cesiaellt Y1oject Kepleselltative (1Cr1() services. <br />Upon completion of construction, Coastal Systems performed post -construction beach profile surveying and <br />mapping. A physical monitoring engineering report was prepared, providing prepost construction beach profile <br />data and babel►1,e COuditi0ns. <br />Envi,vnmental Pe,mitting. cvastai <br />Engineering <br />,IAN <br />33U (11/004) VAlat 3 <br />