|
21 TITLE AND LOCATION fCiry and State)
<br />JU50 519nat0,e Semen Non.101mant
<br />fanny testas tieacn, Flo, l3a
<br />a. PROJECT OWNER I b. POINT OF CONTACT NAME
<br />Sunny Isles Beach Associates; LLC Mr. Ron Choron
<br />130 B rK@II AvE,,00
<br />Miami, Florida 33131
<br />EAAMPLEPROJECt RET
<br />AOMBER
<br />Iz YEAR Ft3MIP[E i Eu
<br />PROFESSIONAL SERVICES I CONSTRUCTION jlfapplicable)
<br />ongoing ZU14
<br />c POINT OF CONTACT TELEPHONE NUMBER
<br />(305) 351-1000
<br />rlcRoronLToRune-network.com
<br />44 BRIEF Cc5eRir 110111 vr PROamC i mMI3 RI!rcvr.NCE TO THIS CONTRACT (Include scope, size, and cosr)
<br />Coastal Systems provided beach profile surveying services relative to the Florida Department of Envi1o,,,,,e„tal
<br />Protection (FDEP) Coastal Construction Control Line (CCCL) permit compliance for the Jade Signature (Project)
<br />devel0Y111e,1t located at 16901 C011i1,3 Ave,luc i1, Su....y Isles Beach. Pre -construction beach profile surveys and
<br />u,appi,q f0, D,UUU Iu,Ca1 feet of ohoaelu,C vvuie conducted p,io, to the *,,,,t,lCmC,aat;U„ of the proposed truck haul
<br />beach nourishment for the Project area.
<br />Coastal Systems completed the coastal engineering design of the 35,835 cubic yards (cy) beach fill project. A
<br />t,ha5ed-al.,r„vaeh vvaa t„opmed fm the u11Y1errreutaL,U11 of the P,:,ject by t1,.:.,g the 17,820 cy of sand stockpiled
<br />tro11, the CACavat►o.,. 111e 1cT11a►nael of the beach fill r.vjeat Waa c0111pleted With the app.oved Comity source of
<br />sand from the Ortona Mine.
<br />Additionally, Coastal Systems provided consulting services relative to the construction of the project, including
<br />CU1151r=iv11 1rlal.s, bid a55i5LaaCC, C0115t1uC6011 adm11u5i1at1v11, construction surveying, volume calculations, and
<br />turbidity monitoring. The 111111 also p1OVIU611Cesiaellt Y1oject Kepleselltative (1Cr1() services.
<br />Upon completion of construction, Coastal Systems performed post -construction beach profile surveying and
<br />mapping. A physical monitoring engineering report was prepared, providing prepost construction beach profile
<br />data and babel►1,e COuditi0ns.
<br />Envi,vnmental Pe,mitting. cvastai
<br />Engineering
<br />,IAN
<br />33U (11/004) VAlat 3
<br />
|