My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bermello Ajamil RFQ 16-06-02
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-06-02) Landscape Architect Services (Final)
>
Responses
>
Bermello Ajamil RFQ 16-06-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2016 11:55:09 AM
Creation date
7/18/2016 11:50:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINIMUM REQUIREMENTS 3 <br />16CITY OF SUNNY ISLES BEACH LANDSCAPE ARCHITECT SERVICES RFQ NO. 16-06-02 <br />9. PAST PERFORMANCE (REFERENCES) <br /> <br />1.) City of Hallandale Beach <br />Project Manager: Richard M. Labinsky, P.E. <br />Project Type: a) Topographic – Northeast Quadrant – Drainage Study with floor elevations <br /> Amount: $15,900.00 <br /> b) Topographic – Southwest Quadrant – Drainage Study with floor elevations <br /> Horizontal & Vertical Control for aerial photogrammetry. <br /> Amount: $61,790.00 <br /> c) Route Survey – Ansin Boulevard from HBB to L. James School <br /> Amount: $13,750.00 <br /> d) Boundary & Topographic & Tree Survey - South Beach Park <br /> Amount: $9,500.00 <br /> e) Boundary & Topographic & Tree Survey - Scavo Park <br /> Amount: $12,500.00 <br /> f) Route Survey - Diplomat Parkway – Route Survey <br /> Amount: $16,187.50 <br /> <br />Contact email address for Mr. Labinsky: rmlabinsky@gmail.com <br /> <br /> <br />2.) City of Hallandale Beach <br /> Project Manager: Gregg Harris <br />Project type: a) Boundary and Topographic Survey – Golden Isles Tennis Club <br /> Amount: $8,800.00 <br /> <br /> b) Boundary and Topographic Survey – Ingalls Park <br /> Amount: $8,500.00 <br /> <br /> Contact email address for Mr. Harris: gharris@cohb.org <br /> <br />3.) City of Hollywood <br />Project Manager: Clece Aurelus, P.E. <br />Project Type: a) Topographic / Route Survey / As-Built – North 64th Avenue Drainage <br /> Improvements. <br /> Amount: $30,395.00 <br /> b) Topographic Survey / Route Survey - Dixie Highway Sanitary Sewer Project. <br /> Amount: $46,955.00 <br /> c) Topographic Survey / Route Survey - Portions -Garfield Street to Arthur Street. <br /> Amount: $23,000.00 <br /> <br />Contact email address for Mr. Aurelus: caurelus@hollywoodfl.org <br />Gibbs Land Surveyors
The URL can be used to link to this page
Your browser does not support the video tag.