My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bermello Ajamil RFQ 16-06-02
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-06-02) Landscape Architect Services (Final)
>
Responses
>
Bermello Ajamil RFQ 16-06-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2016 11:55:09 AM
Creation date
7/18/2016 11:50:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINIMUM REQUIREMENTS 3 <br />20CITY OF SUNNY ISLES BEACH LANDSCAPE ARCHITECT SERVICES RFQ NO. 16-06-02 <br />RIB-U.S. Cost <br /> <br /> <br />Constructability, Cost and Value Engineering Review Services, City of Miami Beach, Florida <br />Owner: City of Miami Beach <br />Dates of Service: 2012 – Current <br />Scope of Services Provided: <br />Cost Estimating, <br />Constructability, Value <br />Engineering Review <br /> <br />RIB U.S.COST was awarded <br />this Prime contract to assist <br />the city to more precisely <br />identify capital budget <br />requirements. Accurately <br />identifying the monetary <br />requirements for construction <br />allows the City to forecast the <br />monies required prior to <br />issuance of any necessary <br />construction bonds and/or capital budget requirements. <br /> <br />RIB U.S.COST provides various cost control services during various phases of projects including: <br /> <br /> provide detailed quantity take off of materials required to complete various projects in accordance <br />with Technical Specifications and design documents <br /> provide detailed estimates of labor and material costs in an Excel spreadsheet format showing unit <br />prices, based on past comparable unit costs specifically associated with the South Florida Market <br /> provide detailed constructability review with recommendations for alternate means and methods <br />of construction activities, value engineering, scheduling and construction sequencing that will <br />potentially reduce costs of the project <br /> provide a cost comparison to a recognized construction cost estimating service adjusted for South <br />Florida construction. (RS Means or equivalent) <br /> estimates are contained in a single spreadsheet showing cost comparisons individually tabulated <br /> identify any comparable projects including completion dates that were used to develop the <br />construction cost estimate <br /> support City Staff and participate in the value engineering reviews with contractor <br /> support City Staff in the bidding and award phase of projects. <br /> <br /> <br />Sullivan Park Expansion, City of Deerfield Beach, Florida <br />Owner: City Deerfield Beach <br />Dates of Service: 2013 – 2014 <br />Scope of Services Provided: Cost Estimating (Multi-Phase) <br /> <br />RIB U.S.COST provides cost estimating services in support of the rehabilitation, renovation and <br />expansion of the existing Sullivan Park including boat dock and seawall modifications. The redeveloped <br />park will provide an amenity to the Cove Shopping Center and the surrounding community by <br />activating the park with marine facilities like boat slips for transient boats and floating docks for canoes
The URL can be used to link to this page
Your browser does not support the video tag.