|
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330
<br />(1/2004)
<br />MANDATORY USE DATE OF FORM 6/2004
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12 NAME
<br /> JENNA MARTINETTI, PE
<br />13 ROLE IN THIS CONTRACT
<br /> PROJECT MANAGER/
<br /> ROADWAY DESIGN
<br /> ENGINEERING
<br />14. YEARS EXPERIENCE
<br />a TOTAL
<br />11
<br />b WITH CURRENT FIRM
<br />11
<br />15 FIRM NAME AND LOCATION (City and State)
<br /> CALVIN, GIORDANO & ASSOCIATES, IN C. – FORT LAUDERDALE, FLORIDA
<br />16 EDUCATION (DEGREE AND SPECIALIZATION)
<br />B.S., CIVIL ENGINEERING, FLORIDA STATE UNIVERSITY
<br />MAGNA CUM LAUDE
<br />17 CURRENT PROFESSIONAL REGISTRATION
<br />(STATE AND DISCIPLINE)
<br /> PE FLORIDA NO. 69035
<br />18 OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Ms. Martinetti has over eleven years of engineering experience and has worked on projects from inception to project close
<br />out including supporting documents and coordination between all involved parties. Ms. Martinetti’s project manager
<br />experience includes roadway, water, sewer and stormwater infrastructure projects, site development, and neighborhood
<br />improvement projects. Her highway design experience includes design for milling and resurfacing, widening,
<br />reconstruction, safety improvement projects, ADA upgrades and compliance, drainage improvements, signing and
<br />pavement markings, traffic control plans, and storm water pollution prevention control plans. Her experience also includes
<br />utility coordination, participation in the quality control process, electronic delivery, local agency program (LAP)
<br />coordination, and grant writing assistance and supporting documents.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Joe DiMaggio Children’s Hospital Onsite & Offsite Roadway
<br />Improvements. Hollywood, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2008-2011 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Design engineer and manager for offsite improvements at multiple different locations surrounding the hospital
<br />associated with the construction of the Joe DiMaggio Children’s Hospital. Improvements included street closures, 2
<br />new roundabouts, widening, adding turn lanes, signalization, realignment of the roadway, bus bays, and pedestrian
<br />crosswalks. These projects were closely coordinated with onsite hospital expansion, and required considerable utility
<br />and local agency coordination. Construction Cost - $5.2 Million, CGA’s fees - $460,885
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Davie Road Phase 1
<br />Davie, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013-present
<br />CONSTRUCTION (if applicable)
<br />ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project manager for Davie Road from SR 84 to Nova Dr, including roadway widening, adding bike lanes, signalization at
<br />Nova Drive, signing and pavement marking plans, MOT, drainage modifications, lighting, and tree removal/relocations.
<br />Project partially funded by a County Incentive Grant. Construction Cost - $3.3 Million, CGA’s fees - $338,858
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Sage Beach Condominium
<br />Hollywood, Florida.
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011-present
<br />CONSTRUCTION (if applicable)
<br />ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager and EOR for civil site design for condominium complex located east of A1A on Hollywood Beach.
<br />Design and permitting included replacement of the water main, coordination of utilities, drainage design including a
<br />closed system with wells and exfiltration trench as well as offsite roadway and drainage improvements for the two
<br />sites separated by South Surf Road. Construction Cost - $22 Million, CGA’s fees - $178,500
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />SR 870/Commercial Blvd, FDOT District IV
<br />Tamarac, Florida.
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011-present
<br />CONSTRUCTION (if applicable)
<br />ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project manager for the design, permitting and post design services for the RRR project. The scope includes milling
<br />and resurfacing, signing and pavement markings, signalization and lighting upgrades at two intersections, ADA
<br />upgrades, safety improvements, traffic monitoring sites, and utility coordination. Construction Cost - $1.2 Million,
<br />CGA’s fees - $458,579
<br />25
|