My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc. RFQ 16-06-02
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-06-02) Landscape Architect Services (Final)
>
Responses
>
Calvin Giordano & Assoc. RFQ 16-06-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2016 12:22:57 PM
Creation date
7/18/2016 12:05:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20.EXAMPLE PROJECT <br />KEY NUMBER <br />5 <br />21.TITLE AND LOCATION (City and State) <br />DELRAY BEACH CRA- FIRE STATION <br />HEADQUARTERS <br />Delray Beach, Florida <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Civil and Electrical Engineering, <br />Landscape Architecture, <br />Surveying <br />CONSTRUCTION <br />(If applicable) <br />$800,000 <br />23. PROJECT OWNER’S INFORMATION <br />a.PROJECT OWNER <br />City of Delray Beach <br />b.POINT OF CONTACT NAME <br />Tim Tack, P.E. <br />Project Manager <br />c.POINT OF CONTACT TELEPHONE <br />NUMBER <br />(561 ) 243-7315 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)The Delray Beach CRA’s 2002 Downtown Master Plan identified NW/SW 5th Avenue as the mid-point along Atlantic Avenue, between Interstate I-95 and the downtown core. The plan recommended the creation of twin public plazas on the northwest and southwest corners of the intersection to serve as a new neighborhood center and gathering place for the community as a whole. CGA designed the plaza on the Northwest corner which consists of landscape features and pedestrian amenities. The design also included colorful terrazzo and keystone pavers similar to the Libby Wesley Plaza (SW corner) of intersection, and includes four bronze emblems featuring fire rescue motifs. Green building elements such as permeable pavers and native vegetation were also incorporated into the project. The design will allow for seamless integration into the Atlantic Avenue corridor while still honoring the unique civic identity of the Fire Rescue Headquarters. Permits from FDOT and SFWMD were secured. Constructing the plaza areas out of permeable pavers helped to facilitate the drainage requiremnets of the permiting agenices. The existing retention area was relocated and expanded to accommodate the plaza areas. Construction Cost $800,000 Firm Fee’s $57,000 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br />Calvin, Giordano & Associates, Inc. <br />(2) FIRM LOCATION (City and State) <br />Fort Lauderdale, FL <br />(3) ROLE <br />Prime <br />b. <br />c. <br />d. <br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) <br />MANDATORY USE DATE OF FORM 6/2004 <br />41
The URL can be used to link to this page
Your browser does not support the video tag.