Laserfiche WebLink
12076 NW 98 AVENUE <br /> 'FLORIDA ENGINEERING (i05)8 Gardens 8333 FL 33018 <br /> DEVELOPMENT CORP. (305)8208333 <br /> EV:,IE=■ttG <br /> 11000:1511011 a:iJ1 <br /> SUBCONTRACT TIME ADMENTMENT <br /> Project: N.E.174th Street ROADWAY IMPROVEMENTS Subcontract: <br /> Admentment: 8 <br /> Date: 5/4/2016 <br /> Cost Code: <br /> To: CITY of SUNNY ISLES BEACH <br /> The Contract is changed as follows: <br /> Item Description Additional Days <br /> 1 City of North Miami Beach <br /> Water Services waiting for decision to change Materials on the services from 10/26/15 to 11/5/15 <br /> Water services located bet STA 20+60;25+50;25+90;32+50;32+65 <br /> From: 10/26/2015 to 11/5/2015 12 <br /> 2 TECO People Gas <br /> Gas pipe replacement due of the cover of the pipe at the SOUTH HALFT of the intersection of NE 174 th street <br /> From: 11/6/2015 to 12/11/2015 35 <br /> 3 Rain Days <br /> Following are the rain days on record up to 5/3/16: <br /> 1/22/16;1/15/16;2/1/16;1/28/16;1/19/16 5 <br /> 4 TECO People Gas <br /> Gas pipe replacement due of the cover of the pipe at the North half of the intersection of NE 174 th street <br /> From: 3/1/2016 to 4/1/2016 PHASE 2-A 31 <br /> 5 City of North Miami Beach <br /> Time extension due final decision about to replace existing Water Main crossings at NE 174. <br /> From: 4/2/2016 to 4/16/2016 PHASE 2-A 15 <br /> The Original Contract Amount was $ 3,554,269.78 <br /> Net change by previously authorized Change Orders $0.00 <br /> The Contract Amount prior this Change Order was $ 3,554,269.78 <br /> The Contract will be decreased by this Change Order in the amount of <br /> The new Contract Amount including this Change Order will be $ 3,554,269.78 <br /> The Contract Time will be change in: 98 Days <br /> The date of Substantial Competition as of the date of this Change Order therefore is <br /> City of Sunny Isles Florida Engineering <br /> Owner CONTRACTOR <br /> (Signature) (Signature) <br /> Omar Medina <br /> By By <br /> Date Date 5/4/2016 <br />