My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2010-1550
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2010
>
Reso 2010-1550
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2018 1:59:38 PM
Creation date
6/24/2010 10:51:43 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2010-1550
Date (mm/dd/yyyy)
04/15/2010
Description
5th Amend to Agmt w/Beiswenger, Hoch & Assoc. Design Drainage System N. Bay Rd.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br /> <br /> <br />City of Sunny Isles Beach <br />18070 Collins A venue <br />Sunny Isles Beach, Florida 33160 <br /> <br />(305) 947-0606 City Hall <br />(305) 949-3113 Fax <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />The Honorable Mayor and City Commission <br /> <br />FROM: <br /> <br />Jorge L. Vera, Assistant City Manager Service Division <br /> <br />DATE: <br /> <br />4/15/20 I 0 <br /> <br />RE: <br /> <br />Amendment to Beiswenger, Hoch and Associates, Inc. consultant <br />agreement <br /> <br />RECOMMENDA TION: <br /> <br />This resolution is presented to the City Commission for their consideration and <br />discussion. <br /> <br />REASONS: <br /> <br />Now that the Central Island drainage improvement project has been completed, one area <br />along North Bay Road still has some ponding problems. Although we have a ponding <br />issue, during the engineer stage we tried to take into account all possible situations. <br />During the design we took into account the placement of additional wells if needed. <br />However, this variable was not part of the overall design of the project. In order to <br />eliminate the ponding problem on North Bay Road, we would need to add a well and <br />outfall to the drainage system. <br /> <br />Beiswenger, Hoch and Associates, Inc (BHA) is the engineering firm that designed the <br />stormwater system for the Central Island Drainage project. The City would like to <br />amend the BHA contract for them to provide the additional design work. The proposal <br />for the additional design is for an amount not to exceed $22,380, bringing the total <br />contract to an amount not to exceed $1,048,620. <br /> <br />FUNDING SOURCE: <br /> <br />This project is funded from account # 40-538-5653. <br /> <br />A TT ACHMENTS: <br />. Resolution <br />. Agreement <br /> <br />Agenda Item No.IOE <br />Date 411 5/20 I 0 <br />82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.