My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2010-1571
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2010
>
Reso 2010-1571
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2010 11:40:33 AM
Creation date
6/24/2010 11:40:33 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2010-1571
Date (mm/dd/yyyy)
06/17/2010
Description
Ratifying Additional Services and Payments to (BH&A), for Pre-Construction and (CEI)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />WHEREAS, pursuant to Resolution No. 2008-1299, adopted on July 17, 2008, the City <br />Commission approved the Fourth Amendment to the Agreement to provide additional pre- <br />construction and construction engineering and inspection (CEI) services for this project to <br />include curb and guttered streets with increased parking, street lighting, landscaping, and <br />additional improvements to Gwen Margolis Park, for a total fee of Four Hundred Thirty-Nine <br />Thousand Nine Hundred Ninety-Five Dollars ($439,995.00); and <br /> <br />WHEREAS, pursuant to Resolution No. 2010-1550, adopted on April 15, 2010, the City <br />Commission approved the Fifth Amendment to the Agreement to provide additional engineering <br />design services for this project to include drainage for North Bay Road, for a total fee of Twenty- <br />Two Thousand Three Hundred Eighty Dollars ($22,380.00); and <br /> <br />WHEREAS, the City requested Beiswenger, Hoch and Associates to provide <br />engineering design services and Construction Engineering and Inspection (CEI) services relating <br />to the additional three boxes and extended piping placed at the North Bay Road and 183rd Street <br />area, to electrical items, and some minor traffic control modifications for the Central Island <br />Drainage Project, and CEI services for the 183 Street Streetscape Improvements Project; and <br /> <br />WHEREAS, Beiswenger, Hoch and Associates provided these services for the Central <br />Island Drainage Project and the 183 Street Streetscape Improvements Project, in an amount not <br />to exceed Two Hundred Nine Thousand Thirty Two Dollars ($209,032.00), bringing the total <br />contract amount not to exceed to One Million Two Hundred Fifty-Seven Thousand Six Hundred <br />Fifty-Two Dollars ($1,257,652.00), unless amended by prior approval of the City. <br /> <br />NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE <br />CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: <br /> <br />Section 1. Ratifying Additional Services and Payments. The City Commission hereby <br />approves the additional services and payments to Beiswenger, Hoch and Associates, Inc., for <br />the Central Island Drainage Project and construction engineering and inspection (CEI) services <br />for the 183 Street Streetscape Improvements Project, in an amount not to exceed Two Hundred <br />Nine Thousand Thirty-Two Dollars ($209,032.00), bringing the total contract amount not to <br />exceed to One Million Two Hundred Fifty-Seven Thousand Six Hundred Fifty-Two Dollars <br />($1,257,652.00). <br /> <br />Section 2. Authorization of City Manager. The City Manager is hereby authorized to do all <br />things necessary to effectuate this Resolution. <br /> <br />Section 3. Effective Date. This Resolution will become effective upon adoption. <br /> <br />PASSED AND ADOPTED this 1 ih day of June 2010. <br />
The URL can be used to link to this page
Your browser does not support the video tag.