Laserfiche WebLink
<br />Building Official. The Owner shall not be required to pay for the use of electricity or water by <br />the public after the completion of initial construction but will construct the necessary <br />infrastructure to include water lines, plumbing and electrical service as will be necessary to make <br />the easement fully operational. <br /> <br />12. Beach Renourishment. Owner agrees to finance his pro-rata share of long term <br />beach renourishment costs as determined by the City which may be required as a consequence of <br />the impacts that this development will have upon the erosion ofthe adjacent public beach. <br /> <br />13. Beach Buffers. The Owner agrees that no walls or fences shall be constructed <br />within 15 feet of the public beach along the rear property line unless the wall or fence is buffered <br />from the beach by a transition boardwalk at least 15 feet in width running from side property line <br />to side property line along the rear property line. The buffer may be constructed within the <br />public right of way at the Owner's cost provided he obtains permission from all necessary public <br />authorities. Alternately, if permission cannot be obtained at the time of construction, the Owner <br />may opt to escrow an appropriate sum equal to the cost of the buffer so that the city can construct <br />the boardwalk buffer at a later date when permission can be obtained. Should permission not be <br />obtainable within a twenty year period of the commencement of construction, the funds would be <br />returned to the Owner along with any accrued interest that the escrowed funds may have earned <br />during that period. This provision is deemed necessary to insure that the bulk and scale of this <br />proposed project does not intrude upon the usability of the beach, to improve north-south <br />accessibility for handicapped individuals using the access easement to the beach and, to insure <br />that there is an appropriate transition between the beach and the built environment. <br /> <br />14. Coastal Zone. This project site is located within the Coastal High Hazard Area in <br />a Class I evacuation zone. The Owner agrees to mitigate adverse impacts which his project may <br />have upon the feasibility of the City's Coastal Hazard Mitigation Strategy. All overhead utilities <br />adjacent to the public right of way should be placed underground in order to insure the public <br />safety during an evacuation procedure and to insure the ability of the City to restore public utility <br />service subsequent to a storm event. <br /> <br />15. Covenant Running with the Land. These restrictions during their lifetime shall be <br />for the benefit of, and limitation upon, all present and future owner(s) of the real property and for <br />the public welfare. This Declaration, on the part of the Owner, shall constitute a covenant <br />running with the land and may be recorded in the public records of Dade County, Florida, and <br />shall remain in full force and effect and be binding upon the undersigned, and their heirs, <br />successors and assigns until such time as the same is modified or released, pursuant to the terms <br />hereof. <br /> <br />16, Imn.. This Declaration shall be binding on all parties and all persons claiming <br />under them for a period of thirty (30) years from the date this Declaration is recorded, afte '", <br />which time it shall be extended automatically for successive period of ten (10) years each, . c~~" <br />an instrument signed by the then Owner(s) of more than fifty (50%) percent of the subj "'b <br />property, or more than fifty (50%) percent of the unit owners or the Condominium Ass ~ <br /> <br />