Laserfiche WebLink
<br />. ,,, The JIonorable City Conunission <br />May 15, 2003 <br />Page 2 <br /> <br />and any facilities contained therein, shall not be calculated in the building's FAR or shall not have <br />any setback requirements (it can be built lot line to lot line) if a garage portion that exceeds 20' <br />above grade is located behind the building setback. <br /> <br />The sponsor of this section can explain the rationale but the words are at least clear and may now be <br />applied without ambiguity or confusion once the Commission votes on this matter. <br /> <br />LMD:ch <br />Attachment <br />