My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 98- 57
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
1998
>
Reso 98- 57
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 12:07:51 PM
Creation date
1/25/2006 1:56:12 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
98-57
Date (mm/dd/yyyy)
06/11/1998
Description
Interlocal Agmt w/Co:Construct Golden Shores Drainage Improvement Proj.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT" A" <br />STATEMENT OF WORK <br />FOR <br />CITY OF SUNNY ISLES BEACH <br />GOLDEN SHORES DRAINAGE IMPROVEMENT PROJECT <br /> <br />INTRODUCTION <br /> <br />The City of Sunny Isles Beach was substantially developed prior to the establishment of <br />the water quality management controls now employed by the South Florida Water <br />Management District (SFWMD) and Miami-Dade County Department of Environmental <br />Resources Management (DERM). The affected area is within a low-lying area where <br />finish floor elevations and crown of the roads are below the FEMA flood maps and the <br />Miami-Dade County flood criteria maps, respectively. The area of Golden Shores <br />experiences severe flooding problems rendering it difficult for emergency vehicles and <br />residents to navigate their vehicles. An evaluation is on-going to determine other <br />potential drainage improvements needed, Once the project(s) have been identified, they <br />may be considered through separate agreements. <br /> <br />OBJECTIVE <br /> <br />The purpose of this project is to address specific drainage problems and related flooding <br />concerns in the low-lying areas within the project boundaries. The proposed system will <br />be connected to the existing pump station to provide a greater degree of safety and flood <br />protection. <br /> <br />SCOPE OF WORK <br /> <br />The Miami-Dade County (County) will oversee the construction activities which will be <br />directly supervised by the Public Works Department. The drainage system will cover the <br />area bounded by 191st Terrace to the North, Atlantic Boulevard to the East, 186th Street <br />to the South and North Bay Road to the West. The project consists of stormwater <br />infrastructure as specified in our construction plans. <br /> <br />WORK BREAK DOWN STRUCTURE <br /> <br />Task 1. County shall bid the project with the assistance of the Public Works <br />Department, Contract and Specification Section. Advertise the project <br />through competitive bidding. Review bids, and award construction contract <br />to the lowest responsible bidder. <br />
The URL can be used to link to this page
Your browser does not support the video tag.