Laserfiche WebLink
conferences, and any other services not listed in the Tasks mentioned above. This task <br />includes maximum of 6 meetings. <br />The consultant shall perform general services during constriction which include when <br />requested: <br />- Shop drawings review of drainage structures. <br />- Shop drawings review of all pump station and emergency generator materials. <br />- Review of pipe materials. <br />- Issue clarification and interpretations of the contract documents as appropriate <br />to the orderly completion of the work. <br />- Review, evaluate and determine the acceptability of substitute of "or equal" <br />material and equipment by the contractor. <br />