Laserfiche WebLink
• City of Sunny Isles Beach <br />17070 Collins Avenue, Suite 250 <br />Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 fax <br />David Samson <br />MEMORANDUM <br />Mayor <br />Ining Turetsky <br />Vice Mayor <br />TO: <br />City Commission <br />Commissioners <br />Danny Iglesias <br />FROM: <br />Lynn M. Dannheisser, City Attorne <br />Lila Kauffman <br />Connie Morrow <br />DATE: <br />July 15, 1999 <br />James DiPietro <br />RE: <br />Interlocal Agreement forcompletion of design drainage improvement <br />City Manager <br />project located between 183rd Street and 174" Street and North Bay <br />Lynn A1. Dannheisser <br />Road (the "Project"). <br />City Attomey <br />RECOMMENDATION: <br />It is recommended that the Commission approve by resolution the attached Interlocal <br />Agreement for completion of the Project. <br />REASONS: <br />The City Manager and I have been in regular contact with Miami -Dade County <br />Department of Environmental Resource Management relating to this Commission's <br />decision to opt out of the Countywide stormwater utility and to form its own utility. All <br />of the City's stormwater fees heretofore have been paid to the County. Included in the <br />services the County performed for those fees, was the creation and development of <br />engineering plans for the above -referenced Project. The County regrets that these plans <br />have not already been completed , but, has given their assurance through this contract that <br />the plans will be completed by no later than December, 2000. <br />Inasmuch as the City has chosen to opt out of the County -wide facility by Resolution 99- <br />144, but the County must complete performance of the design plans, we must enter into <br />an Interlocal Agreement for the completion of those plans. The attached agreement <br />codifies this understanding. Please make note that notwithstanding numerous discussions <br />with DERM on this point, in the event the County defaults on its obligation to complete <br />these plans, there will be no reimbursement of stormwater fees paid for this purpose. <br />Likewise, however, if the cost of the plans exceeds those fees, the County will absorb that <br />impact and the City will not be responsible for any additional fees. <br />Respectfully submitted, <br />LMD:ch <br />Attachment(s) <br />