Laserfiche WebLink
<br />3.5 CONSTRUCTION DOCUMENTS PHASE <br /> <br />(1) The Architect-Engineer shall prepare, from the approved Design Development Documents, Contract <br />Documents consisting of Working Drawings and Specifications and setting forth in detail the work. <br /> <br />(2) The Contract Documents shall be prepared in Bid Groups for specific work as designated <by the <br />Contractor with the ~greement of the Construction Team. <br /> <br />(3) The nontechnical documents consisting of the necessary bidding infonnation, General Conditions of <br />the Contract, Supplementary General Conditions of the Contract, Division one of the specifications, <br />proposal and contract fonn shall be prepared by the Contractor. The Architect-Engineer shall review <br />and provide the Owner his comments on these documents. Such documents shall not place any <br />responsibility or obligation on the Architect-Engineer that are not already in this contract. <br /> <br />(4) The Architect-Engineer shall provide and distribute 10 hard (paper) copies and 1 electronic copy <br />of the Contract Documents for each Bid Group for review and comment, including the nontechnical <br />documents, as directed by the project director. <br /> <br />(5) Upon approval by the project director of the Contract Documents for each bid group, the Architect- <br />Engineer shall furnish to the Contractor mylar prints of all drawings and camera ready copy of all <br />specification data. <br /> <br />(6) The Architect-Engineer will provide the Owner with two copies of the documents for each bid group, <br />which shall be properly sealed and forwarded to the Project Director and FCO Manager. Copies of <br />the Contract Documents for the Architect-Engineer's use will be the responsibility of the Architect- <br />Engineer. Upon approval of the Contract Documents, the Architect-Engineer will furnish the Owner <br />with..2.. copies of the CADD Documents as described in Article 3.6 (11) hereinbelow. <br /> <br />(7) The Architect-Engineer, consulting with the Construction Team, shall prepare necessary addenda to <br />each Bid Group and provide mylars or camera ready copy of each as appropriate to the Contractor. <br />All addenda, prior to distribution, shall be approved by the Project Director. Copies of each <br />addendum, properly sealed, shall be forwarded to the Project Director and FCO Manager. <br /> <br />(8) The Architect-Engineer shall cooperate in the development of each bid group with the Contractor <br />and provide to the Owner review and comments on the Contractor's prebid estimate of each bid <br />group package. <br /> <br />(9) The Architect-Engineer shall provide Contract documents (Design Documents, Specifications, etc.) <br />which confonn to applicable building codes (see Chapter 60D-7, Florida Administrative Code) and <br />zoning codes and generally accepted construction industry standards. <br /> <br />The Architect-Engineer shall signify his responsibility for the Contract Documents prepared pursuant <br />to this Agreement by affixing his signature, date and seal thereto as required by Chapters 471 and <br />481, Florida Statutes. If the facility being constructed meets the defmition of a threshold building as <br />defmed in Chapter 553.71 (7), Florida Statutes, then the Architect-Engineer shall insert the following <br />statement on each sheet required by Chapters 471 and 481, Florida Statutes, to be signed, sealed and <br />dated by the Architect-Engineer: <br /> <br />To the best of my knowledge, the plans, specifications and addenda comply with the <br />applicable minimum building codes. <br /> <br />Where this Agreement provides for the Owner's approval of the Architect-Engineer's design <br />suggestions and decisions, such approval shall not relieve the Architect-Engineer of any <br />~ <br />