Laserfiche WebLink
22 Mulch <br />23 Weed Barrier Cloth <br />24 Plant Relocation <br />25 Clearing and Grubbing <br />26 IRRIGATION <br />27 SLEEVE FOR FUTURE LIGHTING <br />BIDDER_A6soC b.TI =6►, WISG <br />BID PROPOSAL <br />PROJECT NAME VE&Mf4CbT100 PAQ(f%C <br />Shredded Melaleuca Mulch 195 $ $ <br />(measured in cubic yards) <br />Amoco Miracle Mat 11400 $ iI S $ <br />(measured in square feet) <br />lump sum <br />lump sum <br />linear feet <br />28 MAINTENANCE AFTER INSTALLATION lump sum <br />(180 Calendar Days) <br />29 RELOCATION OF BUS SHELTER lump sum <br />(Includes construction of conc. slab) <br />Maintenance of traffic is to be included in the prices for all items. <br />76 $ 1gJ °o $ 11 %0 - <br />1 $ $ Z ypp.w <br />TOTAL $ T� <br />LANDSCAPE Z,01,085• <br />1 $ 37 800.°" $ 37, 800.°0 <br />1400 $ 3 to $ 4,QW. o <br />1 $ q 000.'° $ 9.000 "-- <br />1 $ 2000.Oo $ 2000. 00 <br />TOTAL $ .260 %$l•75 <br />3of12 <br />