My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 99-134
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
1999
>
Reso 99-134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2013 4:10:43 PM
Creation date
7/20/2007 11:26:19 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
99-134
Date (mm/dd/yyyy)
04/15/1999
Description
Cable TV Agreement (Ordinance 99-66)
Reference
Ordinance 99-66
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />with FCC regulations and Ordinance No. 99-~. Franchisee shall further comply with each of the <br />following requiremems: <br />A. All antennas, supporting structures, and outside plant used in operating and <br />maintaining franchisee's cable system within the City shall comply with all generally accepted <br />industry standards and all applicable Federal, State, County, City, and/or utility laws, ordinances, <br />rules, regulations and applicable lease agreements relating to tower structures and outside plant. <br /> <br />. <br /> <br />B. All construction, installation and maintenance of franchisee's cable system shall <br />comply with the National Electrical Safety Code, the National Electrical Code, all applicable state <br />and local laws and regulations, and accepted industry practices. <br /> <br />C. Franchisee's cable system shall, at a minimum, meet or exceed all technical and <br />signal quality standards of the FCC and the National Cable Television Association, including such <br />standards as hereinafter may be adopted or promulgated. <br /> <br />Section 15. Proof of performance tests. <br /> <br />Franchisee shall perform at its expense, the proof of performance tests as required by <br />Section 13 of Ordinance No. 99-~and any amendments thereto, to demonstrate compliance with <br />the requirements of that section, this franchise agreement, FCC standards, and the standards of <br />Good Engineering Practices for Measurements on Cable Systems, published by the National Cable <br />Television Association. Upon written request, franchisee, will provide proof of performance test <br />results within 30 days to the City Manager. Franchisee will provide the City Manager at least ten <br />days advance written notice of when a proof of performance test is scheduled so that the City may <br />have an observer present. <br /> <br />Section 16. Access channels and facilities. <br /> <br />A. Access channel capacity. Franchisee shall provide to the City, at least one and a <br />maximum of two activated downstream access channels and at least one and a maximum of two <br />activated upstream channels on the system which the City may elect to use, in whole or in part, <br />for video and audio services solely for educational and/or governmental access use at the City's <br />discretion on the following terms and conditions. <br /> <br />1. Upon written request of the City Manager, based on a <br />directive from the Commission, franchisee agrees that it will <br />cablecast all City Commission meetings taped, or at the City <br />Manager's discretion, live on the cable system and provide tapes of <br />such meetings to the City Manager, other cable operators or <br />residential developments as requested by the City at cost. <br /> <br />-14- <br /> <br />Cable Franchise Agrecmem <br /> <br />\ <br /> <br />" <br /> <br />(jtL(, <br />
The URL can be used to link to this page
Your browser does not support the video tag.