My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2000-255
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2000
>
Reso 2000-255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2013 3:35:25 PM
Creation date
1/25/2006 1:56:39 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2000-255
Date (mm/dd/yyyy)
07/20/2000
Description
David Plummer & Assoc., Traffic Analysis re: City Hall Govt. Complex.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- -li::r(7zer/~la ---14'13- - ,,--,-' <br />_..."'........................~.. . DRIJ1 D f'COMME~&-RSSC" , - , -'- <br />.......",., "................,..,''',..~,::",....'''.:_........ . -+ +3059493113 <br /> <br />NO. 936 <br /> <br />~05 <br /> <br />Task 4 . Traffic Anslysjs <br />The traffic analysis will determine the traffic advantages to the %ea from these two altematives. The <br />..,:;=:' <br />analysis will be conducted using five and ten year projections. These projections will be based on <br />an agreed upon annual growth applied to existing traffic volumes. Any committed projects, such as <br />the City Hall. will be used to adjust these increased volumes. <br /> <br />Standard highway capacity manual techniques will be used in this analysis. It will include the signal <br />phasing recommended at new and existing intersections. The study area will include Sunny Isles <br />Boulevard from SR AlA to the proposed project site. <br /> <br />Task 5 . Siena1 Warrant Study <br />Depending on the alternative selected, there could be up to two new traffic signals in this project. <br />Under this task the consultant will arrange 72 hour traffic counts at each approach of the subject <br />locations. The traffic volumes will be compared to the traffic_yolume-related warrants in the Manual <br />.,;:-. .1, <br /> <br />on Uniform Traffic Control Devices. The volume warran~alysis win include the projected traffic <br />volumes for the Sunny Isle Beach Civic Center project. <br /> <br />For warrants that are not based on traffic volumes. the consultant will estimate the applicability <br />and/or likelihood that those warrants will be satisfied. The estimate will be based on available data, <br />sample observations, andlor general knowledge of the area. <br /> <br />The analysis and conclusions will be summarized in a report. AU appropriate analysis forms and <br />data will also be included in the document. The consultant will submit the report to the client for <br />formal submittal to the FDOT. <br /> <br />Task 6 - Graphic Presentations <br /> <br />....;. -,. <br /> <br />There will be a great deal of public interest in the ac~iis to the City Han and the changes to the <br />general operations on Sunny Isles Boulevard. Under this task we will prepare exhibit boards for <br />presentations at a public level of understanding, showing existing conditions and recommended <br />improycmcnt:s for both alternatives. <br /> <br />4 - -' - <br />
The URL can be used to link to this page
Your browser does not support the video tag.