Laserfiche WebLink
<br />The Total Project Cost (Line F) must equal the grant request (Line A) plus the total local funds available <br />(Line E). Thisflgure (Line F) should not total more than $400,000 for the purpose of this application. <br /> <br />A. FRDAP Funds Requested <br /> <br />Line A $ <br /> <br />B. Local Funds Available: <br /> <br />1. Cash: Line B $ <br /> <br />2. In-Kind: Line C $ <br /> <br />3. Land Value Line D $ <br />If property is developed, land value CANNOT be used as a match. <br /> <br />Total Local Funds Available: <br /> <br />Line E $ <br />Sum of lines B, C and D <br /> <br />C. Total Cost of Proposed Project: <br /> <br />Line F $ <br />Sum of Lines A and E <br /> <br />D. PROJECT COST ESTIMATE (COMPLETE ONLY FOR DEVELOPMENT & TRAILS <br />PROJECTS): The project cost estimate break down is on the folloWing page of this application. <br />If land value is used as match, it should be included under primary cost. Primary costs include all <br />recreation facilities and opportunities. Primary cost must be equal to or greater than fifty percent <br />of the total cost. Attach a separate sheet if needed. Remember to include each element in your <br />conceptual site plan. Submit a conceptual site plan displaying the areas and facilities to be <br />developed as proposed on page 6 of this application. The site plan must correlate with the <br />project boundary map and cost estimate. The site plan must CLEARLY DELINEATE between <br />facilities/opportunities currently existing, facilities proposed for funding (page 6) in this <br />application and facilities planned for future development. Please color code your site plan to <br />indicate facilities that are existing, proposed for funding and planned for future development <br />(not in this project) (Please Tab As Exhibit "G") <br /> <br />PRIMARY RECREATION AREAS AND FACILITIES: Including. but not limited to. beach access, picnic <br />facilities. fishing piers. ballfields. tennis courts, trails, trailheads. etc. Costs of planning and site preparation should be <br />included within the cost of each element. If this is a trail project. list the uses or types of trails. <br /> <br />Page 5 of 24 <br /> <br />FPS-A033 <br />