My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2001-374
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2001
>
Reso 2001-374
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2024 3:45:43 PM
Creation date
1/25/2006 1:56:55 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2001-374
Date (mm/dd/yyyy)
09/20/2001
Description
– Agmt w/Miller, Legg & Assoc., Landscape Arch. Srvs for Active Pk.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Proposal No. 3968 <br /> <br />8. Additional Revisions - Revisions required by each reviewing <br />agency upon review of the initial submittal shall be included in this <br />fee. Subsequent revisions or revisions required by concept changes <br />shall be provided as additional services and shall be invoiced on an <br />hourly basis. The fee for this phase is estimated not to exceed $750 <br />without prior authorization from Client. <br /> <br />FEE: Hourly per the attached Hourly Rate Schedule. <br /> <br />Phase 14 Conceptual Water Management Plan - Consultant shall prepare a <br />conceptual water management plan for the project which shall <br />include construction details for an exfiltration system. Engineering <br />permit applications, plans, and support data shall be prepared for <br />submittal to the South Florida Water Management District (SFWMD), <br />Miami-Dade County, DERM, and the City of Sunny Isles for approval <br />and/or informational purposes as appropriate. <br /> <br />FEE: Lump Sum of $1 ,680. <br /> <br />NOTE: The fee for this phase does not include environmental <br />services associated with the SFWMD permitting process. <br /> <br />Phase 15 Calculated Site Plan <br /> <br />A. Preparation - Consultant shall prepare a horizontal control <br />plan of the project based on the approved site plan. This plan shall <br />show the bearings and distances of the property lines, center lines, <br />right-of-way lines and easement lines and the dimensions of <br />buildings, pavement, landscape areas and other site improvements. <br />This phase does not include the preparation of a coordinate point <br />map. <br /> <br />FEE: Lump Sum of $1 ,500. <br /> <br />B. Additional Revisions - Revisions required by minor/major <br />architectural or other coordination needs shall be on an hourly basis. <br />The fee for this phase is estimated not to exceed $500 without prior <br />authorization from Client. <br /> <br />FEE: Hourly per the attached Hourly Rate Schedule. <br /> <br />Phase 16 On-site Engineering Plan - Consultant shall prepare engineering <br />plans and specifications for on-site improvements including, grading, <br />and storm drainage system; water distribution system; and gravity <br />sewage collection system including a lift station and force main as <br />required for development of the Project. Engineering permit <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.