My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2001-374
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2001
>
Reso 2001-374
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2024 3:45:43 PM
Creation date
1/25/2006 1:56:55 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2001-374
Date (mm/dd/yyyy)
09/20/2001
Description
– Agmt w/Miller, Legg & Assoc., Landscape Arch. Srvs for Active Pk.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Proposal No. 3968 <br /> <br />A. Architectural Bidding Services - Bidding Services will <br />include the preparation of or processing of any related addendum or <br />RFI's if required. <br /> <br />B. Architectural Construction Administration - Construction <br />Administration will include the review of architectural shop drawings, <br />responses to architectural/engineering RFl's, conduct a maximum of <br />four (4) site visits to occur at various times throughout construction, <br />inclusive of one (1) substantial completion site visit/punch list and <br />one (1) final completion/closeout site visit/punch list. B&A will <br />process all RFl's and shop drawings. B&A will distribute appropriate <br />copies and maintain a shop drawing log. <br /> <br />FEE: Lump sum of $5,775. <br /> <br />Phase 22 Site/Engineering Construction Services <br /> <br />A. Bidding Assistance/Contract Administration - Consultant <br />shall assist Client in preparation of bid package, answering <br />contractor RFl's, review of bids, preparation and negotiation of <br />contract(s) and execution of contracts for the site development work <br />on the project. The fee for this phase is estimated not to exceed <br />$9,000 without prior authorization from Client. <br /> <br />FEE: Hourly per the attached Hourly Rate Schedule. <br /> <br />B. Preconstruction - Consultant shall attend preconstruction <br />conference, review material shop drawings, and assist contractor <br />prior to commencement of construction. <br /> <br />FEE: Lump Sum of $2,000. <br /> <br />C. Construction Observation Shall include general <br />observation of the site work, review of contractor pay requests and <br />verification of system testing. Services include up to ten (10) hours <br />per week for Engineering/Landscape Architecture inspector and four <br />(4) hours per week of Project Engineer/Project Manager time. <br /> <br />FEE: Lump Sum of $40,000. <br /> <br />D. Statements of Work Completion - Shall include statement of <br />work completion, review and submittal of "as-built" drawings <br />prepared by the Contractor's registered land surveyor and <br />assistance in conveying utility systems to the City of Sunny Isles. <br /> <br />FEE: Lump Sum of $2,000. <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.