My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2001-389
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2001
>
Reso 2001-389
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2013 4:26:56 PM
Creation date
1/25/2006 1:56:56 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2001-389
Date (mm/dd/yyyy)
11/13/2001
Description
– Addendum to Agmt w/O’Leary Design, Landscape Upgrade Plan/Med.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Scope of Services <br />Page two <br /> <br />Re: Collins Avenue/SR AINLandscape Upgrade Plan <br /> <br />· Review other consultants landscape plan, for the Lehman Causeway <br />area, to determine compatibility with the overall design concept. <br /> <br />· Assist the City of Sunny Isles Beach in securing the required FDOT <br />permit. <br /> <br />II) Bidding Phase <br /> <br />· The Consultant shall assist the City of Sunny Isles Beach in securing <br />competitive bids for this project. <br /> <br />· These services will include attendance at a pre-bid conference, <br />answering of bidders questions during Bidding Phase, issue addenda, <br />evaluation of competitive bids, and written recommendation of <br />successful bidders. <br /> <br />III) Construction Administration Phase <br /> <br />· Attend pre-construction "kick-off' meeting. <br /> <br />· Attend all coordination meetings with City and Florida Department <br />of Transportation. <br /> <br />· Perform periodic observations during the construction process. <br /> <br />· Complete all meeting minutes and project correspondence. <br /> <br />· Review and approve contractor's shop drawings and payment <br />requisitions. <br /> <br />· Complete final inspection and final punch-list and issue Notice of <br />Acceptance to contractor. <br /> <br />IV) Responsibility of the City of Sunny Isles Beach, Florida <br /> <br />· Any required engineering plans, including, but not limited to, <br />Maintenance of Traffic Plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.