My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2001-390
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2001
>
Reso 2001-390
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 2:58:25 PM
Creation date
1/25/2006 1:56:57 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2001-390
Date (mm/dd/yyyy)
11/13/2001
Description
– Bid Award 01-09-01, Agmt w/Lukes’, Maintain Pks/Medians/R-ofWay.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH <br />Bid No. 01-09-01 <br />Page No. 31 <br />PARKS/IVIEDIANS/RIGHT-OF-WAY MAINTENANCE <br />SPECIFICATIONS <br />show completion of maintenance items previously described, the City shall request, and require <br />corrective action to be taken at no charge to the City. <br />3. Payment for work shall be authorized upon evidence of completion, and will occur on a <br />monthly basis. <br />4. Any additional work requested within the scope of work shall be charged at the cost per cut <br />or unit price rate. The contractor will be given at least 24 hours notice prior to a call for service. <br />5. NON-CONFORMANCE TO CONTRACT CONDITIONS: <br />The City of Sunny Isles Beach may withhold payment or reject areas which are found, upon <br />examination, not to meet the specification requirements. Upon written notifications of rejection, <br />subject areas shall be rectified within five (5) calendar days by the vendor at his expense. <br />Rejected areas left longer than fifteen (15) calendar days will be regarded as abandoned. <br />Rejection for non-conformance, failure to provide services conforming to specifications, or <br />failure to meet service schedules, may result in the Contractor being held in default and shall <br />authorize the City to terminate the contract upon notice to the Contractor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.