My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2001-398
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2001
>
Reso 2001-398
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2024 3:58:12 PM
Creation date
1/25/2006 1:56:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2001-398
Date (mm/dd/yyyy)
11/13/2001
Description
– Agmt w/Spillis Candela to Design New City Hall/Government Ctr.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-,~-J....-t I ....l-JWt:.) .::>r L LL !.:J '-MI~VC:LH ,... I t'(::l <br /> <br />1'(10 t"taO <br /> <br />~~ ~ ~4 4~.~t <br /> <br />Spillis Candela OMJM <br /> <br />ATIACHMENT NO.2 <br />limitations on scope of services: <br />Sunny Isles Beach Government Center <br />December 4/ 2001 <br /> <br />M@@ting with Ownpr <br /> <br />1. Schematic Design Phase <br />a. Three review meetings with Owner. <br />b. One Schematic Phase Final meeting. <br />c. Two public hearings. <br /> <br />2, Construction Document Phase <br />a, Two meetings with Owner at AlE's office plus 50% and 100% Construction <br />Document Review. . <br /> <br />3. Bidding <br />a. Opening of sub-contractor bids - one meeting <br /> <br />4. Construction - Construction Conference Meetings only. Refer to Meetings during <br />Construction below. <br /> <br />Meetings During Construction <br />1. Fourteen monthly construction (or Owner/Contractor) conferences <br />(Seven by Project Manager (PM); Fourteen by Construction Administrator (CA); one <br />each by engineer of each discipline) <br /> <br />Sitt~ Visit~ During Construction <br />1. PM and CA: Site visits will occur during monthly construction (or Owner) <br />conferences. <br />Eight visits at four hours ea. <br />Two visits at four hours ea. <br />Six visits at four hours ea. <br />Six visits at four hours ea. <br /> <br />2. Structural Eng.: <br />3. Civil Eng.: <br />4, Mechanical Eng.: <br />5. Electrical Eng.; <br /> <br />M~ings During Construc.tiQn Oocument Pha~ with rnn~trurtion Manager <br />1. Two meetings at four hours each in NE/s office (with all SC OMJM disciplines) <br /> <br />Cost Estim.atP- <br />Cost estimates to be provided by Construction Manager or separate cost estimating service <br />provided by Owner. <br /> <br />Other Mp.p.tiOg,~ <br />Other meetings not specific:ally outlined above will be charged at SCDMJM standard <br />billing rates. <br />
The URL can be used to link to this page
Your browser does not support the video tag.