Laserfiche WebLink
<br />(15) The Architect-Engineer shall have authority to order minor changes in work not <br />involving an adjustment in a Contract Sum or an extension of a Contract Time <br />and which are not inconsistent with the intent of the Contract Documents. Such <br />changes shall be effected by written order issued to the Contractor endorsed by <br />the project director. <br /> <br />(16) The Architect-Engineer, assisted by the Contractor, shall conduct inspections to <br />determine the dates of substantial completion and final completion and shall issue <br />appropriate Certificates. <br /> <br />(17) The Architect-Engineer shall assist the Contractor in receiving and forwarding to <br />the Owner written warranties and related documents assembled by the <br />Contractors. <br /> <br />(18) The extent of the duties, responsibilities and limitations of authority of the <br />Architect-Engineer as a representative of the Owner during construction shall not <br />be modified or extended without the written consent of the Owner. <br /> <br />ADDITIONAL SERVICES OF THE ARCHITECT-ENGINEER <br /> <br />4.1 For additional services requested by Owner, not within the current understanding of the <br />Basic Services identified in this Agreement and the proposal submitted by Architect <br />Engineer on December 4, 200 I, the Architect Engineer shall be compensated on an <br />hourly basis. Such services shall be documented in writing by Architect-Engineer prior <br />to their commencement. Such additional services, while not limited to the following, <br />shall include: <br /> <br />4.2 Additional services due to significant changes in general scope of the Project or its <br />requirements including, but not limited to, changes in size, complexity, or character of <br />construction. <br /> <br />4.3 Revising previously approved drawings or specifications to accomplish changes. <br /> <br />4.4 Providing Detailed Cost Estimates. <br /> <br />4.5 Conduct two (2) public hearings. <br /> <br />4.6 When required by the Owner, preparing documents for Change Orders. <br /> <br />4.7 Consultation concerning replacement of any work damaged by fire or other cause during <br />construction and furnishing professional services of the types set forth in Article 3 as may <br />be required in connection with the replacement of such work. <br /> <br />4.8 Arranging for the work to proceed should the Contractor default due to delinquency or <br />insolvency. <br /> <br />,\ttny / Final Agreement Between SIB and <br />Spillis Candcla/2/25/02 / (eb) <br /> <br />9 <br />