Laserfiche WebLink
<br />progress of the Project. The project schedule shown as Exhibit "E" shall be <br />amplified in further detail by the Contractor with the agreement of the Architect- <br />Engineer which agreement shall not be unreasonably withheld. <br /> <br />ARTICLE 6 <br /> <br />THE OWNER'S RESPONSIBILITIES <br /> <br />6.1 The Owner shall provide full information as to his requirements for the Project. <br /> <br />6.2 The Owner shall designate representatives authorized to act in his behalf. He <br />shall examine documents submitted by the Architect-Engineer and render <br />decisions pertaining thereto promptly to avoid unreasonable delay in the progress <br />of the Architect-Engineer's work. He shall observe the procedure of issuing <br />orders to Contractor only through the Architect-Engineer. <br /> <br />6.3 The Owner shall retain a Contractor to manage the Project. The Contractor's <br />services, duties and responsibilities will be a described in the Agreement Between <br />Owner and Contractor. The Terms and Conditions of the Owner/Contractor <br />Agreement will be furnished to the Architect-Engineer and will not be modified <br />without notification ofthe Architect-Engineer. <br /> <br />6.4 The Owner shall furnish a certified survey of the site giving, as required, grades <br />and lines of streets, alleys, pavements and adjoining property; rights of way, <br />restrictions, easements, encroachments, zoning, deed restrictions, boundaries and <br />contours of the building site; locations, dimensions and complete data pertaining <br />to existing buildings, other improvements and trees; full information as to <br />available service and utility lines, both public and private; and test borings and <br />pits necessary for determining subsoil conditions. <br /> <br />6.5 The Owner shall pay for structural, chemical, mechanical, soil mechanics or other <br />tests and reports, if required. <br /> <br />6.6 The Owner shall arrange and pay for such legal, auditing and Insurance <br />counseling service as may be required by the Owner for the Project. <br /> <br />6.7 If the Owner observes or otherwise becomes aware of any defect in the Project, he <br />shall give prompt written notice thereof to the Architect-Engineer and Contractor. <br /> <br />6.8 If the estimate of Construction Cost or Detailed Cost Estimates are in excess of any limit <br />stated herein, the Owner may give written approval of an increase in the limit or he shall <br />cooperate in revising the project scope or quality, or both, to reduce the cost as required. <br /> <br />:\ttny/Final Agreement Between SIB and <br />Spilli~ Candcla/2/25/02 /(eb) <br /> <br />11 <br />