Laserfiche WebLink
<br />ARTICLE 9 <br /> <br />PAYMENTS TO THE ARCHITECT -ENGINEER <br /> <br />9.1 PAYMENTS ON ACCOUNT OF ARCHITECT-ENGINEER'S SERVICES <br /> <br />(1) Payments against the following Lump Sum portions of the Basic Services Fee <br />shall be made monthly in proportion to the percentage of each completed during <br />the previous months: <br /> <br />Schematic Design Studies Phase....... ......... .., ......... ..... 72.600.00 <br />Furniture Fixtures....... ......... .... ............ .... ....... ....... 35.000.00 <br />Construction Documents Phase <br />50% Documents.................... ........ ....... .. ... . .,. .172.700.00 <br />100% Documents.. ..... .... ......... ............... ..... ....172.700.00 <br />Receipt of Bids or Construction Authorization. ... ...... .., ...... <br />Construction Phase..... ......... ...... ................. .... ......... .161,500.00 <br />TotaL...... .................................................... ...... .$ 614.500.00 <br /> <br />(2) Payments for Additional Services of the Architect-Engineer as defined in Article <br />4 hereinabove as a Lump Sum shall be made as prescribed in the Authorization. <br /> <br />(3) Payments for Additional Services of the Architect-Engineer's services as defined <br />in Article 4 hereinabove as a Multiple of Actual Payroll Costs, and for <br />Reimbursable Expense as defined in Article 8 hereinabove, shall be made <br />monthly upon presentation of a detailed invoice. <br /> <br />(4) Forty (40) calendar days shall be allowed for the Owner's inspection and approval <br />of the goods and services for which any invoice has been submitted. <br /> <br />9.2 PAYMENTS WITHHELD <br /> <br />(1) No deductions shall be made form the Architect-Engineer's compensation on <br />account of penalty, liquidated damages or other sums withheld from payments to <br />Contractor, or on account of changes in Construction Cost other than those for <br />which the Architect is held legally liable. <br /> <br />(2) The Architect-Engineer shall not withhold payments to consultants if such <br />payments have been made to the Architect-Engineer by the Owner. Should this <br />occur for any reason, the Architect-Engineer shall immediately return such <br />monies to the Owners, adjusting pay requests and project bookkeeping as <br />required. <br /> <br />Attny/FinalAgreemcnt Between SIB anJ <br />Spillis Candela/2/2S/02 /(eb) <br /> <br />14 <br />