Laserfiche WebLink
<br />___~_.__~~ ~lLL1~ ~HNUCLH ~l~ <br /> <br />170 ~ <br /> <br />~~ ~ ~~ ~q;~( <br /> <br />Spillis Candela OMJM <br /> <br />AnACHMENT NO.2 <br />limitations on scope of services: <br />Sunny Isles Beach Government Center <br />December 4, 2001 <br /> <br />M~ting with Ownpr <br /> <br />1. Schematic Design Phase <br />a. Three review meetings with Owner. <br />b. One Schematic Phase Final meeting. <br />c. Two public hearings. <br /> <br />2 . Construction Document Phase <br />a Two meetings with Owner at AlE's office plus 50% and 100% Construction <br />Document Review. . <br /> <br />3. Bidding <br />a. Opening of sub-contractor bids - one meeting <br /> <br />4. Construction - Construction Conference Meetings only. Refer to Meetings during <br />Construction below. <br /> <br />M~tings During l.nnstrudion <br />t. Fourteen monthly construction (or Owner/Contractor) conferences <br />(Seven by Project Manager (PM); Fourteen by Construction Administrator (eA); one <br />each by engineer of each discipline) <br /> <br />Sit@ Visits puring C':nnstructiOD <br />1. PM and CA: Site visits will occur during monthly construction (or Owner) <br />conferences. <br />Eight visits at four hours ea. <br />Two visits at four hours ea. <br />Six visits at four hours ea. <br />Six visits at four hours ea. <br /> <br />2. Structural Eng.: <br />3. Civil fng.: <br />4. Mechanical Eng.: <br />5. Ele<.1ricat Eng.; <br /> <br />M~ings During C':nn!>truc:ti(}n Dnru~nt Pha~ with fnn4trudion Manavr <br />1. Two meetings at four hours each in NE's office (with all SC OMJM disciplines) <br /> <br />ro~t Estima~ <br />Cost estimates to be provided by Construction Manager or separate cost estimating service <br />provided by Owner. <br /> <br />OthPl' Meeting" <br />Other meetings not specifically outlined above wilt be charged at SCDMJM standard <br />billing rates. <br />