My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2002-413
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2002
>
Reso 2002-413
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2013 3:45:18 PM
Creation date
1/25/2006 1:57:00 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2002-413
Date (mm/dd/yyyy)
01/17/2002
Description
– Agmt w/Spillis Candela & Part., Arch. Srvs: New City Hall, 18050 Coll.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />These files were created to supplement the official Contract Documents. Due to <br />the possibility that files of this nature can be modified, either unintentionally or <br />otherwise, or that the information contained in these files can be used in a manner <br />for which they were not originally intended, Architect-Engineer makes no <br />representation that the files, after delivery, will remain an accurate representation <br />of the source date in the Architect-Engineer's possession, or are suitable for any <br />other purpose or use, and all indications of Architect-Engineer's (and its <br />subconsultants') involvement shall be removed from each electronic display and <br />shall not be included in any prints produced there from. <br /> <br />Owner understands and agrees that the right to use the electronic files provided <br />under the Agreement is specifically limited to same; Architect-Engineer does not <br />have the right to sub-lease for Owner's use any software required to access the <br />electronic files, and no such license is granted hereby. Owner acknowledges its <br />responsibility to obtain all hardware and software needed to access the electronic <br />files. <br /> <br />3.4 BIDDING PHASE <br /> <br />(I) The Contractor shall be responsible for administering the bidding of each Bid <br />Group. <br /> <br />(2) The Architect-Engineer shall evaluate product equals at the request of the <br />Contractor and make a decision on each in a timely manner up to a maximum of <br />20 hours. <br /> <br />(3) The Architect-Engineer shall attend the prebid conference and bid opening for <br />each Bid Group. <br /> <br />(4) The Architect-Engineer will assist the Contractor in evaluating all bids received <br />and provide comment and recommendation to the Owner on each proposed <br />authorization for work. <br /> <br />3.5 CONSTRUCTION PHASE <br /> <br />3.5.1 Construction Phase - Administration of the Construction Contract Work under Contract <br />to Contractor. <br /> <br />(1) The Construction Phase will commence with a written authorization from the <br />Contracts Administrator for Construction to begin and, together with the <br />Architect-Engineer's obligation to provide Basic Services under this Agreement, <br />will terminate when final payment to the Contractor is made, or in the absence of <br />a final Certificate for Payment or of such due date, 30 days after the date of <br />Substantial Completion of the total project, whichever occurs first. <br /> <br />i\ttny/Final Agreemcnt Between SIB and <br />Spillis Candela/2/2S/ll2 I(cb) <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.