<br />4.2.6 The Architect will have authority to reject Work that does not conform to the Contract Documents. Whenever the <br />Architect considers it necessary or advisable, the Architect will have authority to require inspection or testing of the Work in <br />accordance with Subparagraphs 13.5.2 and 13.5.3, whether or not such Work is fabricated, installed or completed. However, <br />neither this authority of the Architect nor a decision made in good faith either to exercise or not to exercise such authority shall <br />give rise to a duty or responsibility of the Architect to the Contractor, Subcontractors, material and equipment suppliers, their <br />agents or employees, or other persons or entities performing portions of the Work. <br /> <br />4.2.7 The Architect will review and approve or take other appropriate action upon the Contractor's submittals such as Shop <br />Drawings, Product Data and Samples, but only for the limited purpose of checking for conformance with information given and <br />the design concept expressed in the Contract Documents. The Architect's action will be taken with such reasonable promptness as <br />to cause no delay in the Work or in the activities of the Owner, Contractor or separate contractors, while allowing sufficient time <br />in the Architect's professional judgment to permit adequate review. Review of such submittals is not conducted for the purpose of <br />determining the accuracy and completeness of other details such as dimensions and quantities, or fi.lf substantiating instructions for <br />installation or performance of equipment or systems, all of which remain the responsibility of the Contractor as required by the <br />Contract Documents. The Architect's review of the Contractor's submittals shall not relieve the Contractor of the obligations under <br />Paragraphs 3.3, 3.5 and 3.12. The Architect's review shall not constitute approval of safety precautions or, unless otherwise <br />specifically stated by the Architect, of any construction means, methods, techniques, sequences or procedures. The Architect's <br />approval of a specific item shall not indicate approval of an assembly of which the item is a component. <br /> <br />4.2.8 The Architect will prepare Change Orders and Construction Change Directives, and may authorize minor changes in the <br />Work as provided in Paragraph 7.4. <br /> <br />4.2.9 The Architect will conduct inspections to determine the date or dates of Substantial Completion and the date of fmal <br />completion, will receive and forward to the Owner, for the Owner's review and records, written warranties and related documents <br />required by the Contract and assembled by the Contractor, and will issue a fmal Certificate for Payment upon compliance with the <br />requirements of the Contract Documents. <br /> <br />4.2.10 If the Owner and Architect agree, the Architect will provide one or more project representatives to assist in carrying out <br />the Architect's responsibilities at the site. The duties, responsibilities and limitations of authority of such project representatives <br />shall be as set forth in an exhibit to be incorporated in the Contract Documents. <br /> <br />4.2.11 The f.remteet will iRteFpfet anEl EleeiEle matters eOBeemmg perfefRlaftee HEier, and reEfairemeiHS af, the Cant:faet <br />DoeameiHS oa 'l.,.itteft reEfllest of either the O?JRer or CeftB=aetar. The f.fElhiteet's ft!spoose te saeh FeElllests will Be maEle iR writiRg <br />within allY time limits agreeEl apon ar etheFVlise 'lAth reaso_le pfompmess. If ae agneRlent is maEle 60fteemiRg the time 'JIfthiR <br />..",hieh iRtefpretatioRS re~eElof the .\:felHteet shall be famisheEl iR sempliaaee t'Adl this PaFagfllph 4.2, theft E1elay shall aet Be <br />reeogni2!eEl ea aeeoant of failufe by the ArelUteet te famish weh iBtefpretatieRS _liS days after vJritteR reEf8e5t is made fer <br />~ Should disa~eement occur between the Contractor and Architect over accq>tability of work and conformance with the <br />requirements of the !!pecification plan. the Owner or Proiect Director shall be the final decision maker of performance and <br />acceptability. subiect to claims provisions provided herein. <br /> <br />4.2.12 All intetllretations and decisions of the Architect shall be consistent with the intent of. and reasonable inferable from. the <br />Contract Documents and shall be in writin& or in ~phic form.lRteFp...tatiaRs &REI deeisioRS afthe Arehite6t will he 69RSisteRt <br />with the iRtent of aad reaso_ly iafeml'lle Hem the Cefdfaet Doeumests and "'.ill Be in ..'Jfitiag Of ill the CaRR af limwmgs. WheR <br />fBakHtg saeh iRteFpfetatioRS BRa iRitial deeisioRS, the .~mteet ..'Jill eadelWor te seSYfe failhfal perfeftBltft6e lIy heth Ot'mer a8d <br />Cesaetof, will Bet shew parhality te either a8d 'Nillaot Be liaBle for resalts ef iRtefJIft!tatieRS or EleeisioD5 so ft!adereEl iR geeEl <br />faidh <br /> <br />4.2.13 The Architect's decisions in matters relatin~ to aesthetic effect shall be final if consistent with the intent of the Contract <br />Documents. The Architect's decisions on any other claims. disputes or other matters. includine those in q.uestion between the <br />Owner and the Contractor. shall be subiect to claims provision provided. eft lRattefS relatiRg to aesthetie effeet 'lJiIl Be {bal if <br />eaD5isteat wHk the iRtent eJiPressea iR the Ca8tfaet DoeameRts. <br /> <br />4.3 CLAIMS AND DISPUTES <br /> <br />DeliHitieH. f. Claim is a aeHlaR6 ar ilssertiaft BY eRe sf the pafties seeiaBg, as a JRatter af right, aEljllStJReftt 8r <br /> <br />e AlA DOCUMENT AlOI-GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION - 1997 EDITION - AlA - COPYRIGHT 1997 - THE <br />AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W., WASHINGTON, D.C, 20006-5292. W ARNlNG: Unlicensed photocopying <br />violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AlA and can be <br />reproduced without violation until the date of expiration as noted below. User Document: weitz 201 city of sunny,aia -- 4/3/2002. AlA License Number 1000746, <br />which expires on 8/3/2002, <br /> <br />Electronic Format A201-1997 <br />~\ <br />/_>IJ <br />