My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2002-433
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2002
>
Reso 2002-433
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2013 4:27:16 PM
Creation date
1/25/2006 1:57:02 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2002-433
Date (mm/dd/yyyy)
04/18/2002
Description
– Agmt w/Weitz Company: Construction Srvs for New City Hall.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />due to the sole negligence of a party seeking indemnity. <br /> <br />Insert k 10.3.4 The obligations of the Owner as set forth in this Paragraph 10.3 shall survive the termination of <br />the Contract. <br />10.4 The Owner shall not be responsible under Paragraph 10.3 for materials and substances brought to the site by the <br />Contractor unless such materials or substances were required by the Contract Documents. <br /> <br />10.5 If, without negligence on the part of the Contractor, the Contractor is held liable for the cost of remediation of a hazardous <br />material or substance solely by reason of performing Work as required by the Contract Documents, the Owner shall indenmify the <br />Contractor for all cost and expense thereby incurred. <br /> <br />10.6 EMERGENCIES <br />10.6.1 In an emergency affecting safety of persons or property, the Contractor shall act, at the Contractor's discretion, to prevent <br />threatened damage, injury or loss. Additional compensation or extension of time claimed by die Contractor on account of aft <br />emergency shall be determined as provided in this AlVeement.PaFitgl'8ph 4.3 aRe .~.Fti6Ie 7. <br /> <br />ARTICLE 11 INSURANCE AND BONDS <br />11.1 CONTRACTOR'S LIABILITY INSURANCE <br />11.1.1 The Contractor shall purchase from and maintain in a company or companies lawfully authorized to do business in the <br />jurisdiction in which the Project is located such insurance as will protect the Contractor from claims set forth below which may <br />arise out of or result from the Contractor's operations under the Contract and for which the Contractor may be legally liable, <br />whether such operations be by the Contractor or by a Subcontractor or by anyone directly or indirectly employed by any of them, <br />or by anyone for whose acts any of them may be liable: <br /> <br />.1 claims under workers' compensation, disability benefit and other similar employee benefit acts which are applicable <br />to the Work to be performed; <br /> <br />.2 claims for damages because of bodily injury, occupational sickness or disease, or death of the Contractor's <br />employees; <br /> <br />.3 claims for damages because of bodily injury, sickness or disease, or death of any person other than the Contractor's <br />employees; <br /> <br />.4 claims for damages insured by usual personal injury liability coverage; <br /> <br />.5 claims for damages, other than to the Work itself, because of injury to or destruction of tangible property, including <br />loss of use resulting therefrom; <br /> <br />.6 claims for damages because of bodily injury, death of a person or property damage arising out of ownership, <br />maintenance or use of a motor vehicle; <br /> <br />.7 claims for bodily injury or property damage arising out of completed operations; and <br /> <br />.8 claims involving contractual liability insurance applicable to the Contractor's obligations under Paragraph 3.18. <br /> <br />11.1.2 The insurance required by Subparagraph 11.1.1 shall be written for not less than limits of liability specified in the <br />Contract Documents or required by law, whichever coverage is greater. Coverages, whether written on an occurrence or claims. <br />made basis, shall be maintained without interruption from date of commencement of the Work until date of final payment and <br />termination of any coverage required to be maintained after fmal payment. <br /> <br />11.1.3 Certificates of insurance acceptable to the Owner shall be filed with the Owner prior to commencement of the Work. <br />These certificates and the insurance policies required by this Paragraph 11.1 shall contain a provision that coverages afforded <br /> <br />C AlA DOCUMENT AlOI-GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION - 1997 EDITION 1 AlA . COPYRIGHT 1997 - THE <br />AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W., WASHINGTON, D.C. 20006-5292. WARNING: Unlil:cnscd photoc:opying <br />violates U.S. copyright laws and will subject the violator to legal prosecution. This doc:ument was clcctronil:ally produced with permission ofthc AlA and can be <br />reproduced without violation until the datc of cxpiration as noted below. User Document: wcitz 20 I l:ity of sunny.aia - 4/3/2002. AlA ucmsc Number 1000746. <br />which cxpires on 8/3/2002. <br /> <br />Electronic Format A201.1997 <br />3S"iJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.