My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2003-518
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2003
>
Reso 2003-518
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 3:49:08 PM
Creation date
1/25/2006 1:57:15 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2003-518
Date (mm/dd/yyyy)
02/20/2003
Description
– Construction Change Directive #4, Weitz Co., Pile Installation Monitor.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. 2003- <br />A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES <br />BEACH, FLORIDA, APPROVING CONSTRUCTION CHANGE DIRECTIVE NO. 4 IN <br />THE AMOUNT NOT TO EXCEED $9,547.00 BETWEEN THE CITY AND THE WEITZ <br />COMPANY FOR PILE INSTALLATION MONOTORING SERVICES, <br />COMPREHENSIVE CONCRETE STRENGTH MONOTORING AND TESTING <br />SERVICES ATTACHED HERETO AS EXHIBIT "A"; PROVIDING FOR THE CITY <br />MANAGER TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS <br />RESOLUTION; AND PROVIDING FOR AN EFFECTIVE DATE <br />WHEREAS, by Resolution No. 2002 -478, the City Commission approved a construction <br />agreement between the City and the Weitz Company for the construction of the new Tony <br />Roma's restaurant; and <br />WHEREAS, certain services for the construction of Tony Roma's restaurant are not <br />performed by the Weitz Company and are needed to be contract out and approved separately by <br />City Commission; and <br />WHEREAS, the City Commission wishes to proceed on schedule with the construction <br />of Tony Roma's restaurant and has issued a Construction Change Directive to the Weitz <br />Company to contract the services of Mactec Engineering and Consulting Inc. for pile installation <br />monitoring and Professional Engineering & Inspection for the comprehensive concrete strength <br />monitoring and testing services and; <br />WHEREAS, the Construction Change Directive will constitute an amendment to the <br />guaranteed maximum price for the construction contract. <br />NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE <br />CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: <br />Section 1. Approval of Construction Change Directive. The City Commission hereby <br />approves the Construction Change Directive between the City and Weitz Company in the <br />amount not to exceed $9,547.00 for pile installation consultant services provide by Mactec <br />Engineering and Consulting Inc. and comprehensive concrete strength monitoring and testing <br />services provided by Professional Engineering & Inspection, attached hereto as Exhibit "A ". <br />Section 2. Authori , of City Manager. The City Manager is hereby authorized to do all <br />things necessary to effectuate this Resolution. <br />Section 3. Effective Date. This Resolution shall become effective upon adoption. <br />Construction Change Directive No. 4 TWC (ed) 1 <br />JLV /ed <br />
The URL can be used to link to this page
Your browser does not support the video tag.