My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2003-518
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2003
>
Reso 2003-518
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 3:49:08 PM
Creation date
1/25/2006 1:57:15 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2003-518
Date (mm/dd/yyyy)
02/20/2003
Description
– Construction Change Directive #4, Weitz Co., Pile Installation Monitor.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH TONY ROMA'S <br />Project 0 F100000 <br />18050 Collins Ave <br />Sunny Isles Beach <br />FL 33160 <br />Tel: MS- 832 -2772 Fax 305 -932 -2996 <br />Construction Change Directive <br />TWC, Detailed, Grouped by Number <br />Page 1 of 2 <br />r <br />Directive Num : 004 <br />Date Created: 1 002 <br />The Weitz Conipany-Floridd is hereby directed to niake the tollowinq chanq(+") ill this contr;Ict: <br />a <br />The Owner has directed the Contractor to perform all Testing services originally specified to be performed by <br />the Owner. Production Pile installation and Monitering for a not to exceed amount of $6,000.00 as outlined in <br />the proposal prepared by MACTEC Engineering. NOTE: THIS IS FOR PHASE I PILES ONLY. Estimated <br />Not To Exceed Amount of $2,838,00 for Testing services for Tony Roma's Shell and Phase I Sitework to <br />Include: Concrete Test Cylinders, Procotor Tests, Densities, Limerock Bearing Ratio (LBR), Etc. <br />k <br />G951020 .2500 <br />Testing Laboratory Services - Pile Observation <br />Is 6,000 <br />G951020_ 2500 <br />Testing Laboratory Services <br />$ 2,838 <br />Z1020 .7205 <br />Change Order Fee <br />$ 0 <br />Y3020 •25W <br />.175% Data Processing <br />$ 15 <br />Y5010_ 2500 <br />.775% GL Insurance <br />$ 73 <br />YW50_ 2500 <br />.900% Sub Guard Insurance <br />$ 80 <br />X301001_.2450 <br />6% Overhead <br />$ 540 <br />i otan $ 9,547 <br />Pr000sed Adjustments <br />1. The proposed basis of adjustment to the Contract Sum or Guaranteed Maximum Price is: <br />[ ] Lump Sum (increasatdecrease) of <br />[ ] Unit Price of per <br />( ] As provided in Subparagraph 7.3.6 of AIA Document A201, 1997 Edition. <br />[X] Time and Material not to exceed <br />[ ] as follows: <br />2. The Contract Time as a result of this work will be unchanged. <br />3. Approval Required by in order to not delay the project. <br />upon wwcuuon Dy the Arcrinea and owner, this directive shall be effective immediately. <br />— - Z4� -'C L <br />ARCHITE T 6 O ER <br />•K t <br />Address: Ga , faAf, I SS: I �;W e0ut J 3 f0•-v'� -7" v <br />By: �'�r,3aridirar /d+ rf By: & --e L. . UX•A <br />Date: l • 21 .0 3 Date: z� 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.